EFTA02312898.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Daphne Wallace
Sent:
Wednesday, March 20, 2019 6:41 PM
To:
michael glidden; Stephanie Remington; Rich Kahn; Patrick Cena; ann rodriquez; Karyna
Shuliak
Subject:
Re: Shipping Updates - March 19, 2019
Greetings Mike,
Updates:
=/div>
BOL 13609672 - United Rentals - (1) Genie GTH-1256 Telehandler with 72" forks= truss boom, bucket - cleared, ready for
pickup
BOL 136=3711 - Site One Landscape Supply - Irrigation parts - cleared,=ready for pickup
Arrived/Sailed/Booked to=Sail
=
<=iv>BOL 13621516 - BOL 13614385 - 201= Can-Am Maverick - ship to Zorro Ranch per JE - in PPB 3/19 - =span
style="color:rgb(0,0,0)">Lund & Pullara will arrange transport=C2*from FL to NM once 40=A0
=C24>
shipment released
BOL 13623863 - 2015 G=C Yukon Denali (JE) - in PPB 3/19 - Lund & Pullara will arrange transport from FL to Paris once
shipment released 4,=A0
BOL 13609672 - United Rentals - (1) Genie GTH-1256 Telehandler wi=h 72" forks, truss boom, bucket - EDA on STT 3/20 -
clearing 3/20
BOL 13623711- Site One Landscape Supply - Irri=ation parts - on STT 3/17 - clearing 3/20
BOL 13634508 - Discount Equipment - (2) Terex AL= Light Towers - EDA on STT 3/20 - clearing 3/20
BOL 13641679 - scheduled to sail 3/20 -=EDA on STT 3/24
=C2*
4>=A0 Traffic Safety Store - (10) 8' Plastic Speed BumpsQ=A0
40=A0
=C240AG-PRO - JD 6130M Tractor
BOL 13632967 - Shield Up - (2) Gable Pod Roof kits fo= GSJ Christmas Cove Containers - purchased 2/22 - Hardware
received at Tro=ical FL 3/14 -
4>=A0
Structure EDA to Tropic=l FL 3/21
EFTA_R1_01201991
EFTA02312898
BOL 13640387 - 2019 Freightlin=r 122SD dump truck - purchased 3/18 - EDA to ready to ship 4/2
Awaiting Delivery to Tro=ical - Or to LSJ via FEDEX, ETC.4,P=A0
Ul.com - VI=A Setup supplies - purchased 3/15 - EDA to STT 3/20 via UPS
ABC Nursery - (45) =ougainvilleas, (12) Ficus - purchased 2/28 - EDA on LS.13/22 =C2*
Full Compass Systems - (2) Speakers= (2) Subwoofers per JE - purchased 2/19 - EDA to PB House 3/204e=A0
Coastal Construct=on - (150) 6-sack Chromix in Sombrero Buff for (Si road projects - purchas=d 3/4 - EDA to Tropical FL
3/20
Electr=c Bargain Store - (25) Focus Industries PGL-02 BRT Putting Green lights - =urchased 3/11 EDA to Tropical FL 3/21
Ele=tric Bargain Store - (25) Focus Industries PGL-02-BRT Putting landscape li=hts - shipped 3/15 - EDA to Tropical FL
3/21
Home Depot - (15) Global Door Oil Rubbed=Bronze Steel Spring Hinges (3 pk) - Carluz will ship to STT via USPS by 3/=2
Home Depot - (12) Low-Voltage 900 watt Landscape Transformers - purchase= 3/6 - NOW EDA to Tropical Shipping 3/22
Home Depot -=(60) Lumens overhead lights, (30) Progress light sconces - purchase= 3/6 - NOW EDA to Tropical Shipping
3/22
Home Depot - (6) Rheem Water Heaters - purchased 3=6 - EDA to Tropical Shipping 3/22
<=iy>
American Export - (2) 55 gallon drums Rust Bandit - purchased 3/18=- EDA to ready to ship 3/22
Taylor, Cotton, Ridley - (17) SPECIAL LITE DOORS and hard=are RO and Mechanical Buildings - purchased 12/11 - Lead
time 8.10 weeks -=EDA to ready to ship 3/25
=span style="color:rgb(0,0,0)">Tropicars - (1) 2019 Polaris Ranger EV ele=tric vehicle with roof, full windshield - Rust
Proofing 3/23 - EDA to Trop=cal FL 3/26
American Expor= - Red Cedar Lattice for LSJ Tiki Hut project - purchased 3/12 - Lead time=10 business days - EDA to
ready to ship 3/27
John=C. Cassidy - 3 Ton Trane unit for (Si Master Bath - ordered 3/18 - EDA to =ropical FL pending
IBU Gallery - "Pina" Jean Grisoni table - purchased 2/28 - EDA=to STT 4/1
2
EFTA_R1_01201992
EFTA02312899
Gemini Seawater Systems - 25K GPD Containerized Seawater RO System fo= GSJ - WA to Tropical FL 4/10
=div>United Rentals - (1) JLG 600AJ Boom L=ft with 36" man basket, sand tires - purchased 1/31 - Lead time 8 wee=s -
WA to ready to ship 3/29
Reddick Equipment Co. - (1) =00 gallon 2 wheel trailer sprayer, (1) 50 gallon 2 wheel trailer sprayer -=purchased 1/28 -
NOW EDA to ready to ship 4/1
=/div>
Warren CAT - (1) Caterpillar CS54B Roller - purchased 1/29 - Lead tim= 8 weeks - EDA to ready to ship 4/5
American Export Company - =2) 96"x 96" Sliding Glass Doors for Five Palms - purchased 3/5 -=Lead time 6 weeks - EDA
to ready to ship 4/16
Fletcher Larkin =uilding Supplies - (4) cement bag for construction stock - purchased 3/5 -=EDA to Tropical FL pending
</=ont>
Innovation Solar Garden Pr=ducts - (2000) Garden lights - purchased 12/28 - NOW production begins 2/2= - Lead time 11
weeks (55 days) - EDA to MIA 38 days - EDA to STT Ju=e 2019
3
EFTA_R1_01201993
EFTA02312900
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02312898.pdf |
| File Size | 215.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 4,584 characters |
| Indexed | 2026-02-12T14:33:15.632111 |