EFTA02315329.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Daphne Wallace <
a>
Sent:
Friday, April 5, 2019 10:43 PM
To:
michael glidden; Stephanie Remington; Patrick Cena; Rich Kahn; ann rodriquez; Karyna
Shuliak
Subject:
Shipping Updates - April 5, 2019
Greetings Mike, <=div>
Arrived/Sailed/Booked to Sail
BOL 13647052 - Electric Bargain Store - (25) Focu= Industries PGL-02 BRT Putting Green lights - pick up 4/8 to LSJ =A0
BOL 13660849 - pick up 4/8 to L.S1
=AO
=C2 John C. Cassidy - 3 Ton Trane unit for LS1 Master Bath
=C2
Coasta= Construction - (150) 6-sack =hromix in Sombrero Buff for LSJ road projects
BOL 13658371- Tropicars - (1) 2019 Polaris=Ranger EV electric vehicle with roof, full windshield, rust proofed -
=A0cleared, offloaded, pick up 4/4 to LSJ
=div>BOL 13653241- cl=ared, off-loaded, pick up 4/8 to LSJ
=
Home Depot - (12) Low-Voltage 900 watt Landsca=e Transformers
=C2
=AO
Home Depot - (60) Lumens overhead lights, (30) Pro=ress light sconces
=C2
=AO
Home Depot - (6) Rheem Water Heaters ar>
BOL 1366=778 - EDA on STT 4/7 - pre-cleared, pick up to LSJ once off-loaded<=div>
=AO
Shield Ro=f Solutions - (2) Gable Pod Roof kits, Hardware for GSJ Christmas Cove Containers
=AO Gemini Seawater Systems - Wire for GSJ 25K GPD Contai=erized System
BOL 13663419 - =A0EDA on STT 4/7 - pre-cleared, pick up t= LSJ once off-loaded
=AO
=C2
American Export Company - (2) 96"x 96" Slidin= Glass Doors for Five Palms
=C2
American Expo=t - (2) 55 gallon drums Rust Bandit
=div>
BOL 13671233 - booked to sail 4/5 - EDA on STT 4/9
=AO
=C2
American Export - Red Cedar Lattice for LSJ Tiki Hut pr=ject
=C2
Gemini Seawater Systems - C=nduits for GSJ 25K GPD Containerized System
=A0Palmetto Motorsports - parts for Kawasaki Mule Pro- FX
=div>
BOL 13667609 - Palmetto Ford - 2018 Ford F-450 running =oard - scheduled to sail 4/5, EDA on STT 4/9
Full Compass Systems = (2) Speakers, (2) Subwoofers per JE - at PB House 3/20 - will come to L.S.I=on the plane
EFTA_R1_01209818
EFTA02315329
Nest - (2) Nest cameras=for L.51 per JE - ordered 4/4 - scheduled for delivery to PB House - will c=me to L.51 on the plane
Ubiquiti Networks - Parts/=upplies for L.51 Network System project - ordered 4/5 - WA to PBI by 4/15<=div>
Home Depot - (15)=Global Door Oil Rubbed Bronze Steel Spring Hinges (3 pk) - arrived =n STT via USPS - location
PENDING
BOL 1=614385 - 2017 Can-Am Maverick - ship to Zorro Ranch per JE -4=pan> Lund & Pullara arranged tra=sport from FL
to NM - EDA pic= up 4/8
BOL 13611379 = Arabian Majlis and Silk Carpets - ship to Zorro Ranch per JE - in PPB - CPB cleared - </=pan>Lund &
Pullara arranged transport=C2
=AO
=C2 from FL to ZM - EDA pick up 4/8
BOL 13610=08 - EDIC Carpet Shampoo Machine - ship to NY House per JE - in =PB - CPB cleared - Lund & Pullara
arranged transport <=div>
=AO
from FL t= NY - EDA pick up 4/8
BOL 13623863 - 2015 GMC Yukon Denali (JE) - Lund & Pullara filed Carnet - arranging transport=C2 from FL to Paris once
shipmen= once available for =AO
=C2
pickup from Tropical Shipping - EDA CARNE= validation (MIA) 4/9
BOL 13667472 - United Rentals - (1) JLG 600A Boom Li=t with 36" man basket, sand tires - EDA to Tropical FL by 4/8=C2
BOL 13=68663 - Gemini Seawater Systems - RO supplies for GSJ 25K GPD Containerized System - EDA to Tropical FL 4/8
BOL 13640387 - 2019 Freightliner 122S0 dump truck = purchased 3/18 - NOW EDA to ready to ship from AL 4/8 - pick up
scheduled=for 4/10
=OL 13665718 - Warren CAT - (1) Caterpillar 05548 Roller with Shell Kit - N=W EDA to ready to ship from TX 4/25
<=div>
BOL 13664799 - Warren CAT - Caterpillar equipment maintenanc= parts and supplies, buckets, tracks, accessories - sail
date pending =A0
BOL 13653777 - The Shutter Store - LSJ Cab=na Interior shutters - invoice created, awaiting Country of Origin
=div>Awaiting Delivery to Tropical - Or to LS= via FEDEX, ETC.
Taylor, Cotton, Ridley - (17)=SPECIAL LITE DOORS, (1) QUONSET DOOR and hardware RO and Mechanical Buildi=gs - EDA
to
=C2
=AO
Tropical FL 4/10
Gemini Seawater Syste=s - 25K GPD Containerized Seawater RO System for GSJ - EDA to Tropical FL =ending inspection
of container for sea-worthiness </=iv>
2
EFTA_R1_01209819
EFTA02315330
Reddick Equipment Co. - (1)=100 gallon 2 wheel trailer sprayer, (1) 50 gallon 2 wheel trailer sprayer = NOW EDA to ready
to ship 4/12
EBL Watercraft - GI=BS Quadski to be returned to dealer for repairs per JE - EDA to Tropical S=T pending
Innov=tion Solar Garden Products - (2000) Garden lights - in production - Lead t=me 11 weeks (55 days) - EDA to MIA 38
days - EDA to STT June 2019
3
EFTA_R1_01209820
EFTA02315331
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02315329.pdf |
| File Size | 215.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 4,639 characters |
| Indexed | 2026-02-12T14:33:28.521625 |