EFTA02313852.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Daphne Wallace
Sent:
Friday, March 22, 2019 10:46 PM
To:
michael glidden; Stephanie Remington; Patrick Cena; Rich Kahn; ann rodriquez; Karyna
Shuliak
Subject:
Shipping Updates - March 22, 2019
Greetings Mike, adiv>
Arrived/Sailed/Booked to Sail
ABC Nursery - (45) Bougainvillea=, (12) Ficus - on LSJ
BOL 13641679 - EDA on STT 3/=4 - pre-cleared 3/21 - LSJ will pick up next week once available
Traffic Safe=y Store - (10) 8' Plastic Speed Bumps
=AO
AG-PRO - JD 6130M Tract=r
BOL 13614385 - 2017 Can-Am Maverick - ship to Zorro R=nch per JE - in PPB - CPB cleared - Tropical Shipping released -
=A0Lund & Pullara
=C2
=AO
arranging=transport from FL to NM
Full Compass Systems - (2) Speakers, (2) Subwoofers=perJE - at PB House 3/20 - will come to LS1 on the plane =/div>
IBU Gallery - "Pina" =ean Grisoni table for the Library - NOW WA on STT 3/26 via Amerijet - wil= clear once paperwork is
available from Bob Lynch
BOL 13610808 - EDIC Carpet Sh=mpoo Machine - ship to NY House per JE - in PPB - CPB cleared - Lund &=Pullara will
arrange transport
=C2
from FL to NY once available for p=ckup from Tropical Shipping
<=font>
BOL 13611379 - Arabian Majlis and Silk Carpe=s - ship to Zorro Ranch per JE - in PPB - CPB cleared - Lund & Pullara will
arrange transport
=AO
from FL to ZM once avai=able for pickup from Tropical Shipping
BOL 13623863 - =A02015 GMC Yukon Denali (JE) - in PPB 3/1= - Lund & Pullara will ar=ange transport from FL to Par=s
once shipment released from
=C2
=A0CBP hold
BOL 13647052 - Electric Barg=in Store - (25) Focus Industries PGL-02 BRT Putting Green lights - at Trop=cal FL 3/21 -
scheduled to sail 3/27
EFTA_R1_01204717
EFTA02313852
BOL 13648301=- John C. Cassidy - 3 Ton Trane unit for (Si Master Bath - at Tropical FL =122 - scheduled to sail 3/27
BOL 13632967 - Shield Up - (2) Gable Pod Roof kits for GSJ Chr=stmas Cove Containers - purchased 2/22 - Hardware
received at Tropical FL =/14
=C2
Structure EDA to Tropical FL still=pending
<=div>
BOL 13640387 - 2019 Freightliner=122SD dump truck - purchased 3/18 - EDA to ready to ship 4/2 <=iv>
Awaiting Delivery to Tropi=al - Or to LSJ via FEDEX, ETC. <=span>
Coastal Construction - (150) 6-s=ck Chromix in Sombrero Buff for (Si road projects - purchased 3/4 - WA to=Tropical FL
UNKNOWN
Home Depot - (15) Global Door Oil Rubbed Bronze Steel=Spring Hinges (3 pk) - Carluz to ship to STT via USPS
Home Depot - =12) Low-Voltage 900 watt Landscape Transformers - purchased 3/6 - NOW EDA =o Tropical Shipping
3/26
Home Depot - (60) Lum=ns overhead lights, (30) Progress light sconces - purchased 3/6 - NOW EDA =o Tropical Shipping
3/26
Home Depot - (6) Rheem Water Heaters - purchased 3/6 - NOW EDA to =ropical Shipping 3/26
Ame=ican Export - (2) 55 gallon drums Rust Bandit - purchased 3/18 - EDA to re=dy to ship 3/22
Taylor, Cotton, Ridley - (17) SPECIAL LITE DOORS and hardware RO and =echanical Buildings - purchased 12/11 - Lead
time 8.10 weeks - EDA to read= to ship 3/25
Tropicars - (1) 2019 Polaris Ranger EV electric vehic=e with roof, full windshield - Rust Proofing 3/23 - EDA to Tropical FL
3/2=
American Export - Red Ced=r Lattice for LSJ Tiki Hut project - purchased 3/12 - Lead time 10 busines= days - EDA to ready
to ship 3/27
Gemini Seawater Systems - 25K GPD Containerized Seawater =O System for GSJ - EDA to Tropical FL 4/10
United Rentals - (1) JLG =00AJ Boom Lift with 36" man basket, sand tires - purchased 1/31 - Lea= time 8 weeks - EDA to
ready to ship 3/29
Reddick Equipmen= Co. - (1) 100 gallon 2 wheel trailer sprayer, (1) 50 gallon 2 wheel trail=r sprayer - purchased 1/28 -
NOW EDA to ready to ship 4/5
Warren CAT - (1) Caterpillar CS54B Ro=ler - purchased 1/29 - Lead time 8 weeks - EDA to ready to ship 4/5=/div>
2
EFTA_R1_01204718
EFTA02313853
American Export Company - (2) 96"x 96" Sliding Glass Doors =or Five Palms - purchased 3/5 - Lead time 6 weeks - EDA to
ready to ship 4=16
Fletcher Larkin Building Supplies - (4) cement bag for cons=ruction stock - purchased 3/5 - WA to Tropical FL pending
Innovation Solar Garden Products - (2000) Garden lights - purchased 1=/28 - NOW production begins 2/20 - Lead time 11
weeks (55 days) - ED= to MIA 38 days - EDA to STT June 2019
3
EFTA_R1_01204719
EFTA02313854
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02313852.pdf |
| File Size | 200.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 4,301 characters |
| Indexed | 2026-02-12T14:33:31.840836 |