JE Punch List — December 18th 2012
1. Clean Up - make as many barge runs as necessary
2. Equipment and Vehicles
- Sell equipment
- No machinery off the island unless approved
3. Five Palms
- Picture Frame (86 x 70) & Canvas on site — contacting framer about coming on site
- Mirrored Siding - removed, stripping/stucco complete — final top coat due to start 12/19
4. Berm/Top of Hill
— Brice investigating a wood/paper combination material for hydro-seeding - on site, will start using
- Pergola construction for high road benches — David — require design details/number from JE
5. Triangle
- Installation of lights — to be completed under JE's direction
6. Flagpole Pool Cabana
- Furniture — Desk — still in Paris awaiting ETA
- Area Rug — JE requested 11/7 either soft white/black design or plain white extra soft rug — Sarah
- Lights —JE to review lights at parking area with Danny
7. LS1 Dock
- Dock Carpet & New Trim — final trim work to be completed by 11/20
8. Dock Boxes
- David will fabricate a lighter lid — sample at MC Pool —JE reviewed — investigating resin/plastic option, up to 4 ft high
will forward by 11/20
9. Chillax Room
- Media Center — on site — will not handle the weight of the equipment — need to investigate other options
10. Chillax Bathroom
- Install Robe Hook on bathroom door —will be installed 11/19
11. Boats
- Lady G — sell — will remain at Nanny Cay until sold. LV investigating selling in NJ
- Midnight Express — sell — possible buyer on site 12/21
— Purchase 20 ft Nautica/Center Consol — sourcing locally
- Purchase New Boat to replace Midnight — require budget
12. AC - Set all air conditioning to 80 degrees
13. Landscaping — Peter's List
- Line all Roads with Rocks & Rocks for Waterfall
• Rubbish Dump - regrade, berm placement along side road
- Transformer area on back high road — plant out
- David to make planter boxes — in production, 1 complete — require JE approval.
- Relocate 2 palms from Salt Pond to edge of the road near transformer at 5 Palms
- Black Heli Under Pads — install at top of bike path at MC — Installation to begin 1/10
- Sea Grape/Citrus Fertilizer/Mulch — where to come with Palms from PR — invoice expected week of 11/17
LV to bring sunflower seeds
14. Roads
- General re-grading of roads — ongoing — Peter
- JE requested investigating surfaces that can handle the weight of the heavy equipment — gravel option
15. Library
- Chiller - all questions have been answered, Rich & Brice working on pricing
16. New Employee Bathrooms
- need to finalize finish material with JE
EFTA_R1_01219184
EFTA02317268
17. Gym
- Shelf — to support bronze sculpture — complete — needs to be raised and base painted same color as walls
- Entire Gym will be painted after visit
18. LSJ Mooring
— Mooring approved — installation 12/18
19. Hangar
- Fuel Containment Pad — via Cecile 11/13 Plan ready for submission, waiting for finalization of VIPA Lease. Tom
Melnick unable to complete, sourcing new bid
20. Steel shed
— ETA L.S1 12/19 Container will be emptied on L.51 & stored until installation crew on site, Construction crew ETA 1/18
- JE approved layout for extra metal sections & roller doors to old engineering area. Drawings/photos forwarded to
Buck Steel
21. Equipment/Household Purchase and Delivery
- Italian Deck Chairs — awaiting shipping/delivery details
- Pool Towels — on site — JE not happy with "feel" prefers previous towels. Will discuss with Sarah
- Pace Clocks ordered 2 units — shipped to incorrect address - reorder
22. Containers — RO & Generators in remaining container — no offers for purchase
24. Stone Walls
— Repair work to replace missing loose stones & complete Heli Pad wall — Gerry & Ti need to discuss schedule with JE
25. Heli Pad - Wind sock — to be relocated week of 12/17
26. Cisterns —
- Bid approved 11/8 Work to start 1/18 expected completion by 2/6 then back to complete the Great Room cistern late
Feb
27. Solar —
- Solar Lights — to be placed everywhere under JE's directions
- Solar Vendors — require update from Jeanne
29. Movie Screen -
- Larry investigating purchase Stewart Screen & new Blue Ray DVD Player
30: Pebble Beach House -
- Fan ordered — on site to be installed week of 12/17
EFTA_R1_01219185
EFTA02317269
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA02317268.pdf |
| File Size | 204.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 4,292 characters |
| Indexed | 2026-02-12T14:33:36.241313 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.