EFTA02313311.pdf
Extracted Text (OCR)
From:
Daphne Wallace
Sent:
Friday, January 4, 2019 4:15 PM
To:
•
ice gordon; Rich Kahn; Kyle reavis; Karyna Shuliak;
Subject:
5 ipping Up ates - January 4, 2019
Greetings Mike,
=/div>
Arrived/Sailed/Booked to Sail
BOL 13480186 - INYO =ools - (1) Pentair Heat Pump - on LS1
BOL 13456502 - JCH - Controller for the LS= Main Distribution pumps - on LSJ
BOL 13463831- Gemini Seawater Systems - (2) p=llets Sulfuric Acid - on LS1
BOL 13484984 - Restoration Hardware - (2) Ottomans, (1) Dres=er for LSJ Staff Cottage - on LS1
BOL 13484056 - Petersen Furnitu=e - (2) pairs of Stainless Steel "T End" Table Bases for the LSJ=Main Compound Kitchen
Table - on LSJ
Duc Duc - (3) Queen Canopy Beds=- on LSJ
Alberto Pinto - Curtains, Curtain Rods, (2) Lamps - on L=1
BOL 13474168 - Warren CAT - Caterpillar 325 Hammer - on STT - Mik= to arrange delivery to LSJ
BOL 13484463 - Pools Supply World - (2= Hayward 2025ADC Pool Cleaners - on STT - Mike to arrange delivery to LSJ<=r>
=OL 13497189 - Absolute Hardwood Flooring - crate of used tools - in=PPB - Absolute Flooring to arrange pickup
<=pan style="background-color:rgb(0,255,0)">BOL 13508921 • on STT 1=/27 - Clearance on 1/8
40=A0
4,=A0
James, Co=ke & Hobson - EGS Controls for RO
Aw=tech Corporation - (2) Awnings, one for the Flagpole Pool and Main Compoun= Pool Shelters
BOL 13506594 - Luli Pools - Alkalinity Up/Re=resh Shock pool chemicals - on STT 12/27 - Clearance on 1/8 4)=A0
BOL 13474139 - Warren CAT - Caterpillar 272 Skid Steer - on STT =2/27 - Clearance on 1/8
BOL 13520500 - sailing 1/= - EDA on STT 1/12
EFTA_R1_01202984
EFTA02313311
4>=A0
SiteOne Landscape - (16=) LESCO 8-2-12/(196) Magriculture Mg Sulphate
4(>=A0
=C* Wildflower Meadows - (20) Rubber Speed Bumps, accessoriesil>=A0
BOL 13506561- Luli Pools - Muriatic=acid - sailing 1/9 - EDA on STT 1/12
Await=ng Delivery to Tropical - Or to LSJ via FEDEX, ETC
Gemin= Seawater Systems - Replacement of the Seawater Supply Pumping Station - p=yment made 10/14 - Lead time 6-
8 weeks
Gemini Sea=ater Systems - 25K GPD Containerized Seawater RO System for GSJ - containe= delayed - NOW EDA to
Tropical FL 1/21-1/25/19
St=rk Carpet - LSJ Custom Carpet requested by JE - purchased 12/5 - Lead time=8-9 weeks
Taylor, Cotton, Ridley - (17) SPE=IAL LITE DOORS and hardware RO and Mechanical Buildings - purchased 12/11 = Lead
time 8-10 weeks
Warren Power - (2) D 175-8 =lectric Generators for LSJ - awaiting confirmation on specs - Lead time 12=13 weeks
Innovation Garden Products - (20O0) Sola= garden lights - purchased 12/28 - Production to start after Chinese New Y=ar -
Lead time 8-10 weeks
2
EFTA_R1_01202985
EFTA02313312
Document Preview
Extracted Information
Document Details
| Filename | EFTA02313311.pdf |
| File Size | 129.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,679 characters |
| Indexed | 2026-02-12T14:34:01.017965 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.