EFTA02316129.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Daphne Wallace <
Sent:
Tuesday, May 14, 2019 6:34 PM
To:
michael glidden; Stephanie Remington; Patrick Cena; Rich Kahn; ann rodriquez; Karyna
Shuliak; Carlos Rodriguez
Subject:
Shipping Updates - May 14, 2019
Greetings Mike, <=div>
STT It=ms for transport to LSJ via Little C
<=iv>ABC Nursery Plants=C2 - (25) Sea grapes, (20) tree braces for LSJ - purchased 5/13 - ready =or pickup
Arr=ved/Sailed/Booked to Sail
BOL 13713967 - Fletcher Larkin Building Supplies - (12) cem=nt bags for construction stock - on STT 5/11- cleared, off-
loaded, awaiti=g pickup
BOL 13720832 - =n 511 5/11 - cleared, off-loaded, awaiting pickup
=C2
=AO- GEI Works - Type 2 HD Permeable Silt Barrier for GSJ
<=pan style="color:rgb(0,0,0)">
=C2
- American Expo=t - LSJ GYM Doors & Windows replacement
BOL 13723585 - Lewis Marine - dock lin=s - on 511 5/14 - awaiting corrected invoice before clearing
BOL 13640387 - 2019 Freightlin=r 1225D dump truck - on 511 5/12 - will clear, register 5/16 f=r pickup over the weekend
BOL 137=6604 - Tiki Shack Importers - (70) r=lls of Thatch - scheduled to sail 5/15 - WA on STT 5/18 =br>
BOL 13665718=- Warren CAT - (1) Caterpillar CS54B Roller with Shell Kit - at Tropical F= 5/9 - scheduled to sail 5/17 if
space is available BOL 13677820 -=EBL Watercraft - GIBBS Quadski returned to dealer for repairs per JE =/span>- at EBL
Watercraft in FL
BOL 136=3863 - 2015 GMC Yukon Denali (J=) - sailed 5/6 - EDA in Le Ha=re France 5/26
Awaiting Delivery to Tropical - Or to LSJ via FEDEX, E=C.
H=ngar Door Specialists - TWA hangar door repairs - materials delivered to T=opical FL 5/9 - scheduled to sail 5/15
Wayfair - (100) Pure =arden Solar Path Bollard LED Pathway Lights, per JE - shipped 5/10 - EDA t= Tropical FL 5/15
BeverageFactory=com - Summit Appliance Commercial Outdoor Freezer for Tiki House - purchas=d 5/9 - NOW EDA to
ship to Tropical FL 5/15
Innovation Solar Garden Products - (2000) Garde= lights - production completed - ETD China 5/14 - EDA to MIA 45 days -
=AOEDA to SIT NOW July 2019<=div>
EFTA_R1_01213232
EFTA02316129
Tropicars - (3) 2019 Polaris Ranger EV, rust proof-rig kit included - purchased 5/10 - Lead Time 12 weeks - EDA ready to
ship =12
Buck Steel - Project BS36653 Order - 40 x 60 Steel building replace=ent for Heavy machinery storage - Engineering
Deposit paid 4/18 - EDA to T=opical FL pending
2
EFTA_R1_01213233
EFTA02316130
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02316129.pdf |
| File Size | 114.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,422 characters |
| Indexed | 2026-02-12T14:34:11.742094 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.