EFTA02315504.pdf
Extracted Text (OCR)
From:
Daphne Wallace sc
>
Sent:
Monday, May 20, 2019 3:19 PM
To:
michael glidden; Stephanie Remington; Patrick Cena; Rich Kahn; ann rodriquez; Karyna
Shuliak
Subject:
Shipping Updates - May 20, 2019
Greetings Mike, <=div>
STT It=ms for transport to LSJ via Little C
<=iv>ABC Nursery Plants=C2 - (25) Sea grapes, (20) tree braces for LSJ - purchased 5/13 - ready =or pickup
Arr=ved/Sailed/Booked to Sail
BOL 13713967 - Fletcher Larkin Building Supplies - (12= cement bags for construction stock - on STT 5/11 - cleared, off-
loaded, a=aiting pickup
BOL 13720832 - on STT 5/11 - cleared, off-loaded, awaiting pickup
=AO
=C2 - GEI Works - Type 2 HD Permeable Silt Barrier for GSJ </=iv>
=AO
- Am=rican Export - LSJ GYM Doors & Windows replacement
BOL 13723585 - Lewis Marine - do=k lines - on STT 5/14 - cleared, off-loaded, awaiting pickup
BOL 13640387 - 2019 Freightliner 122SD dump truck - =n STT - registered, parked, awaiting transport over to LSJ
BOL 13734465 - sailed 5/19 - WA on STT 5/22 Tiki Shack Importe=s - (70) rolls of Thatch
=C2
- =A0Way=air - (100) Pure Garden Solar Path Bollard LED Pathway Lights,=per JE
=span style="color:rgb(0,0,0)">BOL 13677820 - EBL Watercraft - GIBBS=Quadski returned to dealer for repairs per JE - at
EBL Watercr=ft in FL
BOL 13623863 - 2015 GMC Yukon Denali (JE) - sailed 5/6 EDA in Le Havre France 5/26=C2
A=aiting Delivery to Tropical - Or to L.S1 via FEDEX, ETC.
Hangar Door Specialists=- TWA hangar door repairs - materials delivered to STT CARGO 5/9 - sail sc=edule pending
BeverageFactory.com - Summit Applia=ce Commercial Outdoor Freezer for Tiki House - shipped 5/15 - EDA to Tropi=al FL
5/22
Home Depot - H0220-160458 - (2) Samsun= washers and (2) Samsung dryers for LSJ - purchased 5/17 - EDA to
Tropical=FL 5/22
EFTA_R1_01210489
EFTA02315504
Innovati=n Solar Garden Products - (2000) Garden lights - production completed - NO= ETD China 5/21 EDA to MIA 45
days - NOW EDA to STT 7/27
Tropicars - (=) 2019 Polaris Ranger EV, rust proofing kit included - purchased 5/10 Le=d Time 12 weeks - EDA ready to
ship 8/2
Buck Steel - Project 8536653 O=der - 40 x 60 Steel building replacement for Heavy machinery storage - Eng=neering
Deposit paid 4/18 - EDA to Tropical FL pending
2
EFTA_R1_01210490
EFTA02315505
Document Preview
Extracted Information
Document Details
| Filename | EFTA02315504.pdf |
| File Size | 109.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,297 characters |
| Indexed | 2026-02-12T14:34:14.971860 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.