EFTA02313181.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Kim Steube
Sent:
Monday, December 13, 2010 5:16 PM
To:
Sarah K
Subject:
Epstein Master Bathroom
Attachments:
SOSORD1.pdf
Hi =arah,
Estimate attached for the Master =athroom Rug. The lead-time is approx 8 weeks.
Let me know if you have any =uestions.
Thanks,
<=span>
KIM =TEUBE
[ F = 212.266.8794
www.saccocarpet.com
1
EFTA_R1_01202708
EFTA02313181
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA02313181.pdf |
| File Size | 23.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 373 characters |
| Indexed | 2026-02-12T14:34:29.452934 |