JE Punch List — October 1 2012
1. Clean Up - make as many barge runs as necessary
2. Equipment and Vehicles
- Sell equipment
- No machinery off the island unless approved
- New seats for gators and progators - EDA on STT 10/2
- Remaining 2 Queen Seats —on LS1 9/26
- Red Polaris Bike - Power Steering Module for ordered due NM 9/26 - grease & review transmission
- New seat for beach cleaner — ordered — de-rust it, and clean it — Danny to schedule
3. Computers/Phones
- Room 3 Phone not working — Danny repaired 9/21 - COMPLETE
4. Five Palms
- Painting outside — Primer/Base Coat — color as existing — completed 9/21
- Furniture — outside furniture in place —
to tie down cushions to resolve wind issues, completed by 10/10
- Picture frame — measurements forwarded tom-
86 x 70
- Mirrored siding — will continue to reglue — possible mural work
- Piano — retuned — Patrick Baron — 9/18 - COMPLETE
- Transformer shed — painting completed and door installed 9/18 - COMPLETE
- Fiber work — $2,956.25 quote approved — Liston Network completed re-pull, fusing and termination 9/28 — Jermaine
completed reprogramming of switches and phone connection 10/1 - COMPLETE
5. Grotto
- Mattress cover —JE approved buying fabric, making cover locally, will have fabric by 9/23
- Electronic Remote Starter, auto start from Kite House — completed 9/25
6. Berm/Top of Hill
- Hydroseed outside — in progress
- Palm replaced 9/26
7. Triangle
- Must design triangle — awaiting JE direction
- Hydroseed entire area — 9/18 - COMPLETE
8. Flagpole Pool Cabana
- Furniture — desk from Paris ready to ship early September - Sue
9. Floating Dock
- Jet ski bumpers — complete — reviewing whether this type resolves the issues with the jet skis
- Table/Dock Box - Dock box top to be revarnished — Carlos has a possible solution
- Dock boxes - struts should all be replaced-they are alltiflOM
- Swim Ladder— direction from JE on placement required
10. Chillax Room
— Requires furniture piece for electrical/media equipment, review pieces that are stored in PBI — Sarah
11. Chillax Bathroom
- require blue rugs for bathroom & vanity area —
12. Mechanical Building Transformer —on LSJ 9/22
13. Boats
- Lady G — sell — in hurricane storage — offer $60K via JE, Rich to negotiate pricing
- Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000
- Big N — repair — at AYH dock — Brice contacting Subbase for quote on completion of punch list items — Brice also
reviewing bids from "Jersey Bob" and Island Riggings and Hydraulics
- Inside cleaning 3 days/2 pers $720.00 supervised by Carlos — approved JE
- doors/windows in progress — complete by 9/29
- cylinders/boxes in PR — EDA on STT 10/5
EFTA_R1_01210395
EFTA02315485
- Little C — back in operation 9/20 - COMPLETE
14. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees
15. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and
beach — completed 9/20
16. Transient Surge Protection — awaiting arrival at Tropical
17. Landscaping - Peter's List
- High road trees
- High road waterfall
- Line roads with stones
- Pop's Garden — need deer protection — Danny suggested install a motion detector with a strobe light - the deer will
activate the light and it should frighten them away — JE approved 9/24 — Danny sourcing
- Shade cloth — on LS1— Peter installed one for JE review
- Clean mess, cut grass; trim all vines, acacia — owner's drive, blue beach, gym — work in progress
- Peter to clean the sides of the road — work in progress
- Black Heli Under Pads — install at top of bike path at MC — not enough on site to complete project. Larry forwarding
details
- Review growth of sea grape - engineering area
- Hydroseed all pull box areas & engineering
- Continue to line all roads with stones
- Take out the single tree in engineering - Peter might want to cut it, so not to damage lines
- PR Coconut Palms — planted at main entrance, blue beach (5), berm, Five Palms, MBR — completed 9/27
18. Roads
- Priority is Gym road grading — remove sand and re-grade — COMPLETE
- General re-grading of roads — ongoing — Peter
- Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review
details with Betteroads 9/17
19. Library
- AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor
20. New Employee Bathrooms
21. Gym
- New punching bag — installation of the speed bag on hold 9/22 - per JE until visit
- New front & back doors installation — will complete after visit
22. Beach Office
- complete electrical overall required
- waterproofing/sealing/painting/replace rotten wood required
23. LSJ Mooring — Darren forwarded to Army Corp for final approval — awaiting response
24. Hangar
- Fuel Containment Pad — draft approved, drainage incorporated — survey forwarded to the architect 9/18 - he will
complete the plan by 10/5, submit to DPNR for permitting (Cecile's update as of 9/21)
25. Main compound
- Projector Screen — new limit switches and motor required — Danny completed repairs 9/20 - COMPLETE
26. Steel shed — Buck Steel (FL) —JE approved mock-up 9/26, changes 9/27 — Buck Steel working on the final specs and
quote
27. Equipment to be Purchased
- (1) light generator, (2) arms with lights to be hard wired
- (1) skid steer at Tropical — on LSJ 9/26
- (1) John Deere box and blade — Brice has recommended JD 5101E AWD — loader, scraper, digger, 100hp, enclosed cab
- (1) man-lift
- (1) golf cart — at Tropical — on LSJ 9/26
- (1) dump truck — JE approved purchase — 2012 Ford F450 - $15,000 deposit sent 9/25, shipment booked at Tropical
28. LSJ Mats — for all locations — ordered 9/11
EFTA_R1_01210396
EFTA02315486
29. Engineering — start emptying/relocating items in remaining 20 foot containers 10/9
30. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them
31. Part Time Employees — a
forwarded information of 2 potential part-time housekeepers to
9/25 —
to schedule meeting with them on 10/1
32. Heli Pad - reinstall windsock to north side of helipad - JE & Larry to review lights and windsock location when next
on site
33. Cisterns — need to be cleaned and sealed work to begin 11/1
- Solar lights installation COMPLETE - JE does not like the "white light", likes a "soft white" light — JE to review when on
site
- Solar quote reviewed with Rich, submitted to JE 9/17 — now researching line loss on cable
EFTA_R1_01210397
EFTA02315487
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA02315485.pdf |
| File Size | 326.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 6,659 characters |
| Indexed | 2026-02-12T14:34:29.688472 |