Back to Results

EFTA02338219.pdf

Source: DOJ_DS11  •  Size: 28.4 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: brice gordo Sent: Friday, January 13, 2017 7:30 PM To: Jeffrey Epstein Cc: Rich Kahn Subject: LSJ RO Plant Jeffrey Confirming the RO Plant on LSJ =s now running on auto The Profibus repeater was replaced this mo=ning, this cleared the E stop alam I also have a copy of the RO =lant PLC program, and are working on replacing the existing PLC as precaut=onary measure. The next stage is to sort out a PMA with someone/=ompany for the Plant. regards Brice Gordon EFTA_R1_01300156 EFTA02338219

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA02338219.pdf
File Size 28.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 513 characters
Indexed 2026-02-12T15:03:21.616230
Ask the Files