EFTA02338219.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
brice gordo
Sent:
Friday, January 13, 2017 7:30 PM
To:
Jeffrey Epstein
Cc:
Rich Kahn
Subject:
LSJ RO Plant
Jeffrey
Confirming the RO Plant on LSJ =s now running on auto The Profibus repeater was replaced this mo=ning, this cleared
the E stop alam I also have a copy of the RO =lant PLC program, and are working on replacing the existing PLC as
precaut=onary measure.
The next stage is to sort out a PMA with someone/=ompany for the Plant.
regards
Brice Gordon
EFTA_R1_01300156
EFTA02338219
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02338219.pdf |
| File Size | 28.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 513 characters |
| Indexed | 2026-02-12T15:03:21.616230 |