Back to Results

EFTA02338302.pdf

Source: DOJ_DS11  •  Size: 45.2 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Alireza Ittihadieh Sent: Friday, June 26, 2015 8:04 PM To: jeevacation@gmail.com Cc: Larry Visoski (Ivjet@aol.com) Subject: Re: VP-BBJ Maintenance PO/WO The reason for the inspections taking longer than 2A quoted is because the =OM is clearing out all due AD's till December. V-BR Alireza ITTIHADIEH From: Alireza Ittihadieh Sent: Friday, 26 June 2015 20:39 To: jeevacation@gmail.com Cc: Larry Visoski (Ivjet@aol.com) Subject: FW: VP-BBJ Maintenance PO/WO 2A Check attachedc=span> From: Steve =ilson Sent: Monday, June 15, 2015 9:37 AM To: Alireza Ittihadieh Cc: VP-BBJ William Christophe Subject: VP-BBJ Maintenance PO/WO Hi Alireza, Please find PO / Work Scope attached. Best regards, Steve Wilson Mob: EFTA_R1_01300296 EFTA02338302 2 EFTA_R1_01300297 EFTA02338303

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02338302.pdf
File Size 45.2 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 806 characters
Indexed 2026-02-12T15:03:29.528801
Ask the Files