Back to Results

EFTA02349683.pdf

Source: DOJ_DS11  •  Size: 51.0 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Larry Visoski Sent: Thursday, March 24, 2016 1:21 PM To: Je vacation; Lesley Groff Cc: Rich Kahn Subject: GIV update Jeffrey, Elevator flight con=rol cable was changed due to ware. While doing flight control che=ks, Gulfstream mechanic noticed a clicking sound in control yoke, while rot=ting aileron yoke. They removed the Yoke from cockpit= replacing nut plate under floor board in cockpit, time consuming,. Better u=date on delivery status later today.,Dave and I plan to arrive at Wes=field at noon tomorrow. Thx Larry Pete and Larry, Aircraft is still in t=il dock. Wing leak checks ongoing as some panels have leaked and requi=e corrective action. O2 bottles installed and leak checked. = We have run into some challenge's with the yoke repair/installation. This i= pushing our time frame back. We will access any revision to delivery l=ter today as work progresses and we can make an accurate estimate.c/=iv> Tha=k You, Mike Tucker Gulfstream Westfield Ma. rdiv>Sent from my iPhone 1 EFTA_R1_01326384 EFTA02349683

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA02349683.pdf
File Size 51.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,056 characters
Indexed 2026-02-12T15:12:35.923385
Ask the Files