Back to Results

EFTA02348790.pdf

Source: DOJ_DS11  •  Size: 71.2 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Jermaine Ruan Sent: Tuesday, January 27, 2015 3:11 AM To: jeffrey E. Subject: Re: Good Night Boss Terrence is to start the integrating the tower into LSJ main =etwork Tuesday 1/27 to 1/29 and his new completion date for full =ompletion is 2/6. I emailed Danny today requesting the new circuits =ecessary for the flag pole pool audio system. I will organize with =andy the landscaper to help me start burying the cables on Wednesday =/28. I am also in communication with Larry in finalizing the new rack =or the equipment. He will be in the audio stores tomorrow. Once the new =ack is on its way I will dissemble the system and organize with Anna =nd Pookey to remove the cabinet. Also sir should I start looking for a =ount for the curve? Regards JRuan On =an 26, 2015, at 5:46 PM, jeffrey E. <jeevacation@gmail.com> wrote: speaker wires flagpole . terrrance/ ? ..= please note The information contained in this =ommunication is confidential, may be attorney-client =rivileged, may constitute inside information, and is =ntended only for the use of the addressee. It is the =roperty of JEE Unauthorized use, disclosure =r copying of this communication or any part thereof is =trictly prohibited and may be unlawful. If you have =eceived this communication in error, please notify us =mmediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this =ommunication and all copies thereof, including all =ttachments. copyright -all rights reserved EFTA_R1_01323105 EFTA02348790

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02348790.pdf
File Size 71.2 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,533 characters
Indexed 2026-02-12T15:12:49.664692
Ask the Files