EFTA02346919.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Sent:
To:
Cc:
Subject:
Tyler Shears <
Monday, October 6, 2014 1:18 AM
jeffrey E.; Richard Kahn
Re: Reply
The progress as of late is slow - but we have also been in=a holding pattern waiting on bad press to slow per our last
conversation.=C2*
I am ready to distribute 3 articles we have queue= and push sentiments in the other direction. Are we past the most
recent n=gative press for now?
We should evaluate at=beginning of next year after we have had time to properly build positive s=ntiment as we have
been planning for.
JE world like to meet in person in NYC to discuss further and talk about how to =inalize this. We need some direct
specific actions from you along with our=plan.
Respectfully
Tyler=Shears
On Sun, Oct 5, 2014 at 4:25=PM,
»= wrote:
Hi Jeffrey,
We were down to one negative with 3 of our sites on the 1st page--until we =ad two waves of bad press: in
March and then in September--last month. Tha= changed what google prioritized.
We now have 3 negatives which is awful.
I'd like to get these feature articles placed, a URL for you as a guest=editor and a URL for you with another
institution. And continue to fortify=your sites.
Your sites perform well when not altered by negative press. Your blog alone=has over 1.8 mil views.
EFTA_R1_01318315
EFTA02346919
2
EFTA_R1_01318316
EFTA02346920
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02346919.pdf |
| File Size | 66.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,349 characters |
| Indexed | 2026-02-12T15:13:36.137248 |