Back to Results

EFTA02356150.pdf

Source: DOJ_DS11  •  Size: 71.6 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Richard Bamett Sent: Sunday, June 19, 2011 3:55 PM To: jeffrey Epstein; rich kahn Subject: RE: Good morning Mr. Epstein the net work cable was completed by sawyers to all=SCU controller locations on 5-12-11. The contract with siemens was signed =y Rich Kahn on 5-31-11. The contract reads under project schedule engineer=ng submittals material ordering, equipment delivery ,installation,st=rt up & commissioning will take two months from contract date for co=pletion which is 7-31-11. Equipment is on order and will be delivered to 7= st street,the project engineer was at 71st on friday 6-17-11 to make a =ack up of the scu controller information . He told me he wou=d contact me when controllers are ready to ship to 9 east 71st.Richard Bar=ett. Date: Sun, 19 Jun 2011 07:44:05 -0400 Subject: Fro • • = • To: si=mans ? house uprgrade ? where are we? The information contained in this communication is confidential, may=be attorney-client privileged, may constitute inside information, a=d is intended only for the use of the addressee. It is the property of<=R>Jeffrey Epstein Unauthorized use, disclosure or copying of this and may be unl=wful. If you have received this communication in error, please notify=us immediately by return e-mail or by e-mail to jeevacation@gmail.com <mailto:jeeva=ation@gmail.com> , and destroy this communic=tion and all copies thereof, including all attachments. copyright -al= rights reserved 1 EFTA_R1_01340157 EFTA02356150

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02356150.pdf
File Size 71.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,497 characters
Indexed 2026-02-12T15:23:40.877100
Ask the Files