From:
Richard Bamett
Sent:
Sunday, June 19, 2011 3:55 PM
To:
jeffrey Epstein; rich kahn
Subject:
RE:
Good morning Mr. Epstein the net work cable was completed by sawyers to all=SCU controller locations on 5-12-11. The
contract with siemens was signed =y Rich Kahn on 5-31-11. The contract reads under project schedule engineer=ng
submittals material ordering, equipment delivery ,installation,st=rt up & commissioning will take two months from
contract date for co=pletion which is 7-31-11. Equipment is on order and will be delivered to 7= st street,the project
engineer was at 71st on friday 6-17-11 to make a =ack up of the scu controller information . He told me he wou=d
contact me when controllers are ready to ship to 9 east 71st.Richard Bar=ett.
Date: Sun, 19 Jun 2011 07:44:05 -0400
Subject:
Fro
• •
=
•
To:
si=mans ? house uprgrade ? where are we?
The information contained in this
communication is confidential, may=be attorney-client privileged, may constitute inside information, a=d is intended
only for the use of the addressee. It is the property of<=R>Jeffrey Epstein Unauthorized use, disclosure or copying of this
and may be unl=wful. If you have received this communication in error, please notify=us immediately by return e-mail or
by e-mail to jeevacation@gmail.com <mailto:jeeva=ation@gmail.com> , and destroy this communic=tion and all copies
thereof, including all attachments. copyright -al= rights reserved
1
EFTA_R1_01340157
EFTA02356150
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA02356150.pdf |
| File Size | 71.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,497 characters |
| Indexed | 2026-02-12T15:23:40.877100 |