From:
Daphne Wallace
Sent:
Wednesday, April 8, 2015 9:21 PM
To:
Jeffrey Epstein
Subject:
Proposed Schedule for Better Roads Paving Project - April 8, 2015
Greetings Sir,
<= class="MsoNormal" style="margin-bottom:0.0001pt;font-size:16px;backgr=und-image:initial;background-
repeat:initial">
As promised, for your review and comments, is a summary of a proposed p=an and schedule for the Road Paving
proj=ct:
Better Roads will mobilize their equipment and lighter materials, using Boyson=/span>, spend =his first week prepping,
to begin laying the asphalt the week of June 15th=
Big N would be the auxiliary vessel for transportation th=oughout the work day in the event Better4>=AORoads needs an
extra load for that day= or if they need to transport support equipment.
Better Roads will coordinate with LSJ on transportation needs. In the event that =ig N is not available, we will work the
extra trips in to Boyson's sch=dule.
Presuming that the scope of the project is still th= same, Better Roads estimates transporting 75-80 truckloads of asphalt
in total for th= project. They will need 5-7 truckloads per day. Bet=er Roads has planned a 5 day per =eek schedule, and
will leave Saturdays and Sundays for "rain days=E2$4.
Boyson can move 2-3=trucks per trip. To catch the high tide, Bette= Roads will be at Red Hook at 6:3= am with all 6
loads. Boyson will take t=e first group (2.3 trucks), turn right around and deliver the second group= and a third group if
needed. Boysoni>=A0would then come back before the end of the day to return the 6 trucks to=STT.
Better Boyson does not have to make extra runs to =eturn empty trucks for other jobs on STT=
Better Road= was asked, and they are willing to transport materials and/or=supplies back from LSJ on return trips t= St.
Thomas.
EFTA_R1_01344634
EFTA02357909
The proposed schedule outlined for your revie= is as follows:
<=pan style="font-size:l2pt;font-family:Arial,sans-serir>
Week 1: Monday, June 8 to Friday, June 12 = Using Boyson -Better=C24>Roads mobilizes equipment to LSJ, comple=e
prep work on LSJ
Boysonaspan> -Better Roads paving (30 loads)
=C2*
Week 3: Monday, June 22 to=Friday, June 26 - =C240=C2Q=C2*
Better=span style="font-family:Arial,sans-serif;font-size:12pt"> Roads<=span> (30=loads)
Week 4: Monday, =une 29 to Wednesday, July 1- Boyson aiv>- Better Roads (20 lo=ds)
Respectfully submitted,
Daphne
2
EFTA_R1_01344635
EFTA02357910
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02357909.pdf |
| File Size | 116.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,447 characters |
| Indexed | 2026-02-12T15:23:47.289309 |