Back to Results

EFTA02357909.pdf

Source: DOJ_DS11  •  Size: 116.4 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Daphne Wallace Sent: Wednesday, April 8, 2015 9:21 PM To: Jeffrey Epstein Subject: Proposed Schedule for Better Roads Paving Project - April 8, 2015 Greetings Sir, <= class="MsoNormal" style="margin-bottom:0.0001pt;font-size:16px;backgr=und-image:initial;background- repeat:initial"> As promised, for your review and comments, is a summary of a proposed p=an and schedule for the Road Paving proj=ct: Better Roads will mobilize their equipment and lighter materials, using Boyson=/span>, spend =his first week prepping, to begin laying the asphalt the week of June 15th= Big N would be the auxiliary vessel for transportation th=oughout the work day in the event Better4>=AORoads needs an extra load for that day= or if they need to transport support equipment. Better Roads will coordinate with LSJ on transportation needs. In the event that =ig N is not available, we will work the extra trips in to Boyson's sch=dule. Presuming that the scope of the project is still th= same, Better Roads estimates transporting 75-80 truckloads of asphalt in total for th= project. They will need 5-7 truckloads per day. Bet=er Roads has planned a 5 day per =eek schedule, and will leave Saturdays and Sundays for "rain days=E2$4. Boyson can move 2-3=trucks per trip. To catch the high tide, Bette= Roads will be at Red Hook at 6:3= am with all 6 loads. Boyson will take t=e first group (2.3 trucks), turn right around and deliver the second group= and a third group if needed. Boysoni>=A0would then come back before the end of the day to return the 6 trucks to=STT. Better Boyson does not have to make extra runs to =eturn empty trucks for other jobs on STT= Better Road= was asked, and they are willing to transport materials and/or=supplies back from LSJ on return trips t= St. Thomas. EFTA_R1_01344634 EFTA02357909 The proposed schedule outlined for your revie= is as follows: <=pan style="font-size:l2pt;font-family:Arial,sans-serir> Week 1: Monday, June 8 to Friday, June 12 = Using Boyson -Better=C24>Roads mobilizes equipment to LSJ, comple=e prep work on LSJ Boysonaspan> -Better Roads paving (30 loads) =C2* Week 3: Monday, June 22 to=Friday, June 26 - =C240=C2Q=C2* Better=span style="font-family:Arial,sans-serif;font-size:12pt"> Roads<=span> (30=loads) Week 4: Monday, =une 29 to Wednesday, July 1- Boyson aiv>- Better Roads (20 lo=ds) Respectfully submitted, Daphne 2 EFTA_R1_01344635 EFTA02357910

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02357909.pdf
File Size 116.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,447 characters
Indexed 2026-02-12T15:23:47.289309
Ask the Files