Back to Results

EFTA02352322.pdf

Source: DOJ_DS11  •  Size: 45.9 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Larry Visoski Sent: Monday, December 28, 2015 10:30 PM To: Je vacation Subject: 6727 update Jeffrey Pumps working normal„ Swapped UFI„ which reset the UFI boxes,. Working normal now, We've fuel fwd and Aft aux tanks with fuel, we will do airborne ops check on=flight to PBI, I should land PBI 8pm If that is ok with you? Thx Larry Sent from my iPhone=?xml version=.0" encoding=TF-8"?> <IDOCTYPE plist PUBLIC "I/Apple/M-0 PLIST 1.0//EN" "http://www.apple.com/DTDs/PropertyList-1.0.dtd"> <plist version=.0"> <dict> <key>date-last-viewed</key> <integer>0</integer> <key>date-received</key> <integer>1451341794</integer> <key>flags</key> <integer>8590195717</integer> <key>gmail-label-ids</key> <array> <integer>5</integer> </array> <key>remote-id</key> <string>573703</string> </dict> </plist> EFTA_R1_01331383 EFTA02352322

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02352322.pdf
File Size 45.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 859 characters
Indexed 2026-02-12T15:23:53.640263
Ask the Files