Back to Results

EFTA02353910.pdf

Source: DOJ_DS11  •  Size: 51.0 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Lesley Groff Sent: Wednesday, June 5, 2013 3:34 PM To: Epstein Jeffrey Subject: Rich Barnett/Air Conditioner for 71st Just an FYI-The air conditioner work will begin on June 13th. The crane =ill be outside for the cooling towers on the 15th. There will be no =ir conditioning at all at 71st Street June 13th through 28th...Rich is =oping air will be back on line on June 28th.=?xml version=.0" encoding=TF-8"?> <!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/Propertylist-1.0.dtd"> <plist version=.0"> <dict> <key>date-last-viewed</key> creal>0.0</real> <key>date-received</key> creal>1370446465</real> <key>flags</key> <integer>8590195713</integer> <key>gmail-label-ids</key> <array> <integer>5</integer> <integer>18</integer> </array> <key>original-mailbox</key> <string>imap://jeevacation@imap.gmail.com/%5BGmail%5D/All%20Mail</string> <key>remote-id</key> <string>307975</string> </dict> </plist> 1 EFTA_R1_01334861 EFTA02353910

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Email Addresses

Phone Numbers

Document Details

Filename EFTA02353910.pdf
File Size 51.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,003 characters
Indexed 2026-02-12T15:24:01.275922
Ask the Files