Back to Results

EFTA02356041.pdf

Source: DOJ_DS11  •  Size: 123.8 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Larry Sent: Tuesday, May 16, 2017 1:43 AM To: Je vacation Cc: Rich Kahn Subject: Fwd: 41 Nautica Photography Link Jeffrey Attached are full set of photos, before and after, and work prog=ess, to complete the additions you requested during your last visit., =div id="AppleMailSignatureu>May 29th completion ,. I'd like to accomplish=one more sea trial before shipping., Again, I apologize on the length of t=e project, there is no excuse, The Fiberglass Shop does Great work,. I'm pl=ased with the finishing work. I s=ill say,. You will be pleased with this boat when completed. Dear Larry, Attached below please find t=e digital photography links of progress work executed on the 41 Nautica, th=se where supposed to have been sent last Monday 8th. Of May, unf=rtunately we have a new office manager who is still finding "His Fe=t" with the company... The stainless work according to Sergio w=Il be delivered next Wednesday 24th. Of May for installation. Rega=ding the ceiling panels as you can see in the photography are complete and w=II go to paint within the next couple of days. We are manufacturing a new cus=om fiberglass panel for fabrication of the port and starboard aft cockpit c=rners and section above the sliding doors, these should be cut by Friday an= going to paint on Monday. The entire interior of the cockpit surfaces have b=en sanded, filled and fared and are in primer. The middle aft deck seat has b=en altered and painted as well as the aft seat back rest, these are both in=talled. The starboard boarding ladder arrived from our supplier on Friday and=will be secured tomorrow. Steering wheel has been ordered as is in route and s=ould be here by Friday / Monday. The mold for the sky light is being fabricat=d by the carpenter and will be completed ready for paint on Friday. As for a c=mpletion time including the breaking down of the enclosure and scaffold we w=II be ready by the Monday 29th. Of May. Warmest regards.=/span> Richard. &nbs=; EFTA_R1_01339886 EFTA02356041 The Fiberglass Shop of Ft. Lauderdale Corp.=/o:p> 2001 SW 20th Street, Bay 120 Fort Laude=dale, FL 33315 954-533-3245 (office) 954-368-=177 (fax) 41 Nautica - Scaffold and secure vessel https://goo.gl/photos/Sds9ZabeaBiQASR4A <https://goo.gl/photos/Sds9Z=beaBiQASR4A> 41 Nautica=- High Density Foam Strips on Cockpit https://goo.gl/photo=/J63SaMbfnsCFgdg57 <https://goo.gl/photos/.163Sa MbfnsCFgdg57> 41 Nautica - Toe Rail Improvements https://goo.gl/photos/8cdHGwFUHoquu2Af6 <https://goo.gl/photos/8cdHGwFUHoq=u2Af6> = 2 EFTA_R1_01339887 EFTA02356042

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Phone Numbers

Document Details

Filename EFTA02356041.pdf
File Size 123.8 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,607 characters
Indexed 2026-02-12T15:24:15.541733
Ask the Files