Back to Results

EFTA02365652.pdf

Source: DOJ_DS11  •  Size: 175.7 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Ann Rodriquez Sent: Saturday, March 22, 2014 7:21 PM To: Rich Kahn; Daphne Wallace Cc: Jeffrey Epstein Subject: Re: LSJ fuel truck estimate > On Mar 22, 2014, at 2:02 PM, Jacques Brya wrote: > Hello Ms. Rodriguez, I have split the estimate into two categories- Truck=and Tank. The costs of the tank are the base requirements for fueling, sep=rating this necessary cost from the chassis may better help in your decisio= in relation to condemning the unit or not. Please be advised that both ta=k and chassis estimates are for off-road/stationary operations only. Use o= this vehicle on public highways would be against the advising of Bryans Di=sel Service, LLC. as it is deemed "unfit for the road". However, with repa=r and installation of the proper lighting, mud flaps, and other required "=n-road" DOT items the unit pending a chassis inspection post sandblasting m=y again be fit for the road. These repairs will be at an additional cost a=d are not included in the estimate. The vehicle was surveyed without a dri=ing operational test. In order to conduct any further survey reporting or m=ve the truck for repairs, installation of air brake tanks and batteries/box=s will be required (have been removed from truck prior to survey). Cost of=all parts and hardware are with base cost shipping estimates included. All=parts and services required are for areas and hardware deemed unfit for ope=ation according to survey conducted on 3/19/2014. > Truck Survey Report: Failed Items Listing > 1. Service and brake air tanks and fittings missing 2. Frame > corrosion requires cleaning refinishing 3. Steel wheels corrosion > required replacement 4. Fuel tank and strapping corrosion in excess > 5. Battery box, cab step, and batteries missing 6. Leak on rear > differential yoke seal 7. Brake cans have excessive corrosion 8. > Complete exhaust disconnection from down-tube 9. Seized grease > fittings and s-cam braking hardware/springs 10.Missing front and rear > bumpers 11.Cab requires repair or replacement seat mounts and door > sill excess cor=osion preventing safe operation 12.Suspension U-Bolts > excessive corrosion 13.Missing vehicle side mirrors 14.Front end drag > link and tie rod ends require replacement and testing pe=ding vehicle > operation > Tank Survey Report: Failed Items Listing > 1. Pump and drive line missing (Gas Side) 2. Plastic tank plugs on > catwalk require replacement 3. Hoses show cracking/ plumbing has > excess corrosion 4. Tank testing DOT out of date > Cost estimates per unit are as follows, a complete itemized service and ha=dware listing will gladly be produced upon request of further services. An= and all costs will be discussed with customer as options are available bas=d upon extent of services rendered and part selection, pricing, and availab=lity. EFTA_R1_01361264 EFTA02365652 > 1. Purchase cost of comparable used chassis not including shipping/taxes.= > 2. Complete overhaul and repair of existing chassis parts and labor-base c=st > 3. Removal, installation, and repair of tank, pumping gear, and fittings w=th labor-base cost > *Tank testing is out of date and requires official test survey conduc=ed when vehicle is operable <?xml version=.0" encoding=TF-8"?> <!DOCTYPE plist PUBLIC "-//Apple//DID NAST 1.0//EN" "http://www.apple.com/DTDs/Propertylist-1.0.dtd"> <plist version=.0"> <dict> <key>date-last-viewed</key> creal>0.0</real> <key>date-received</key> <real>1395516075</real> <key>flags</key> <integer>8590195713</integer> <key>gmail-label-ids</key> <array> <integer>5</integer> <integer>18</integer> </array> <key>original-mailbox</key> <string>imap:Meevacation@imap.gmail.com/%5BGmail%5D/All%20Mail</string> <key>remote-id</key> <string>397778</string> </dict> </plist> $ 12,000.00 $ 12,120.50 $ 9,661.00 2 EFTA_R1_01361265 EFTA02365653

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02365652.pdf
File Size 175.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,885 characters
Indexed 2026-02-12T15:32:47.620260
Ask the Files