EFTA02374552.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Sent:
Friday, April 22, 2011 1:28 PM
To:
Je vacation
Subject:
Boeing Maintenance
Jeffrey,
Boeing needs to be in Maintenance before May 1st, The plan is complete aircraft re-weigh and mandatory AD's that are
due at that time, Larry M will have a down time for these items by Monday, then complete we would comply with SC
check in August 1st is drop dead date,.
I separated these inspections for minimal down time, since you mentioned Africa Mid May??
I would like to fly the Boeing Tue or Wed to Savanna for inspection, is this approved? The faa meeting is Thursday in
Orlando.
Thank you,
Larry
Sent via BlackBerry by AT&T
<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/PropertyList-1.O.dtd">
<plist version="1.0">
<dict>
<key>date-last-viewed</key>
creal>0.0</real>
<key>date-received</key>
<real>1303478859</real>
<key>flags</key>
<integer>8590195713</integer>
<key>gmail-label-ids</key>
<array>
<integer>5</integer>
<integer>18</integer>
</array>
<key>original-mailbox</key>
<string>imap:Meevacation@imap.gmail.com/%5BGmail%SD/All%20Mail</string>
<key>remote-id</key>
<string>150875</string>
</dict>
</plist>
EFTA_R1_01381679
EFTA02374552
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Email Addresses
Phone Numbers
Document Details
| Filename | EFTA02374552.pdf |
| File Size | 64.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,257 characters |
| Indexed | 2026-02-12T15:43:22.517836 |