From:
Lvjet
Sent:
Tuesday, April 1, 2014 7:15 PM
To:
jeevacation@gmail.com
Subject:
update
Jeffrey, Boeing co=pletion is based on Engines returning from Miami,.
Engine shop should be ready to deliver the engines first week of May, =y guess May 15th or about that date for Boeing
test flight,.
sorry, missed your call, I was on the phone with Miami Engine shop,.</=iv> first engine is in test cell for pre disassemble
runs,. bore scope ind=cates some delamination of Compressor area side walls, light corrosion„ w=ich we expected in tail
pipe area, to early to tell price impact, but thes= are normal for engine corrosion inspection,.
-Gulfstream PIM is schedule for baggage door seal when we arrive =hursday, part is in hand already and will start as soon
as we Land. I will=have them inspect Fwd door seal for inflation issues, etc during this=visit,.
thx
Larry
1
EFTA_R1_01380876
EFTA02374179
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA02374179.pdf |
| File Size | 43.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 914 characters |
| Indexed | 2026-02-12T15:43:46.670530 |