EFTA02371381.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Brice Gordon
Sent:
Wednesday, July 13, 2016 7:20 PM
To:
Jeffrey E.
Cc:
Rich Kahn; Zorro Ranch
Subject:
Re: ZDC Microwave Project Update
Jef=rey
=div class="gmail_default" style="font-size:small">We have just receive= notification for 5th, Aug- Zorro Visit.
Do we have your approval to moved forward with R=vised plan to decommission existing Ti Data and Phone Link and
install new Microwave link= including phone by the 5th August.
regards Brice
On Mon, Jul 11, 2016 at 11:58 AM, Brice Gordon
> wrote:
Jeffreyadiv>
Advised Future Tech=of your concerns regarding down time of phone service during install of ne= Microwave
link.
The bes= they can do is
Sl=de the existing T1 link down the tower on Sandia Crest and Ranch, re=stablish service
this will take tw= days and 4 men, cost $6800.00, /down time 2 =ays instead of 5 days
once new link is installed, decommission old T1 lin=, down time 2-4 hrs.
do you wish to proceed with this option
regards Brice
On Fri, Jul 8, 2016 at 12:3= PM, Brice Gordon C
> wrote:
ok
will see what we can do about phones
On Fri, Jul 8, 2016 at 12=35 PM, Jeffrey E. <jeevacation@gmail.com <mailto:jeevacation@gmai=.com> wrote:
ok for sierra, but=cannot have phone disruption
EFTA_R1_01373993
EFTA02371381
On Fri, Jul 8, 2016 at 2:33 PM, Brice Gordo=
> wrote:
Jeffrey
adiv>
Future Tech are=scheduled to be on sight July 31st for the install of Microwave Link from =andia Crest to
Main House.
Install of Link is expected to take 5 to 7 days
There have some changes to the initial =esign.
Due to =ngineering and tower owner concerns, the existing Ti link will be decommis=ioned,
N=w Antennas will be installed in place of existing.
T1 Phone service and Data services wil= use new link,
Please note during this time Phone Services to the Ranch will=be disrupted.
=br>
CenturyLin=
There is an i=sue with the Fiber Install on Sandia Crest.
The initial install entailed laying 6-8 ft of=conduit from Centurylink Demark to an Existing Conduit owned
by tower owne=, Sierra Nevada Towers.
The Tower owner has indicated the existing conduit has been badly=damaged and there will be a need
to lay a new run of conduit from Dmark to=his building. (40' rigid buried and 140' above ground galvanized c=nduit.),
Sierra Nevada have indicated a Estimated Cost of $4500.00, withq=iv>
work been comple=ed by Thursday next week
Centurylink have indicated this could possibly delay install of Ci=cuit
Do I have your appr=val to move forward with Sierra Nevada
Regards Brice
<=div>
Brice GordonStanley, NM
Ph
1=> <tel:°
2
EFTA_R1_01373994
EFTA02371382
=AO please note
The information contained in this commu=ication is
confidential, may be attorney-client privileged, may
cons=itute inside information, and is intended only for
the use of the addre=see. It is the property of
JEE
Unauthorized use, disclosure or copyi=g of this
communication or any part thereof is strictly prohibited
a=d may be unlawful. If you have received this
communication in error, pl=ase notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, a=d
destroy this communication and all copies thereof,
including all a=tachments. copyright -all rights reserved
Br=ce Gordon
Stanley, NM
Ph: <= href="tel:
value="-earget="_bla=k"
=div data-smartmail="gmail_signature">
Brice Gordon
Stanley, NM
Ph:
tel:
=div class="gmail_signature" data-smartmail="gmail_signature">
Brice Gordon
Stanley, NM=C2
Ph
3
EFTA_R1_01373995
EFTA02371383
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA02371381.pdf |
| File Size | 166.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,523 characters |
| Indexed | 2026-02-12T15:44:52.586555 |