EFTA02387100.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Larry Visoski
Sent:
Sunday, July 31, 2016 5:50 PM
To:
Je vacation; Rich Kahn
Subject:
Nautica update
Attachments:
19C3E832-EC80-4C3C-A676-54B3C97F94CAJPG; Untitled attachment 00079.txt;
EDFOE660-7F9C-4A6B-AE06- E45D7CAO1A24JPG; Untitled attachment 00082.txt;
41C1503E-5F21-4D3F-9504-2C0300F9SCF4JPG; Untitled attachment 00085.txt;
3DFSBC05-80F5-47CC-A153-380305181462JPG; Untitled attachment 00088.txt
Jeffrey
Estimated completion date, Mid Sept,.
See current photos of interior.,
Side panels only tacked in place, still need to be feathered with filler, sa=ded and epoxied into place., the paint shop will
sand and apply Non skid to=floor deck.
Making progress.,
Thx
Larry
1
EFTA_R1_01407992
EFTA02387100
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA02387100.pdf |
| File Size | 40.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 734 characters |
| Indexed | 2026-02-12T15:54:43.300759 |