EFTA02384601.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Alireza Ittihadieh
Sent:
Monday, December 1, 2014 3:22 PM
To:
jeffrey E.
Subject:
RE: Re:
My advise from the word get go was keep the changes to a minimum.
Now would you like to share the desired Floor Plan and I will ask Jet Aviation to look at it.
V-BR
Alireza
From: jeffrey E. [mailto:jeevacation@gmail.com]
Sent: Monday, December 1, 2014 2:49 PM
To: Alireza Ittihadieh
Subject: Re:
I am in receipt of your e-mail and attachments.
In reviewing the current and the desired floorplans I realized the layout for the latter hardly retains any seats, divans,
furnishings, bulkheads, side-ledges or monuments in their current cabin location.
This kind of radical floorplan change would require quite large non-reoccurring engineering (NRE) and certification (STC)
effort.
The upper and lower supporting structure, potable, gray and waste water plumbing, electrical (IFE/CMS/Cabin Lighting,
etc), periphery (i.e. headliners, valances and domes) system, in the current cabin layout would have to be demoded as
to allow the new cabin layout.
Not being the completion center holding the original interior STC approved engineering data package we would have to
create the engineering data required to support the certification process (STC) for the new configuration.
The FAA certification level is greater today than it was in 1999, when the original interior was initially certified (STC) In
order to salvage and reuse the existing seats, divans, furnishings, bulkheads, side-ledges or monuments the engineering
for the installation of these cabin elements would have to be validated.
There is the risk that many of the cabin elements certified in the 1999 STC could not be certified in today's regulatory
environment.
In essence the NRE, labor and material costs and the down-time time involved for the desired floorplan would be even
greater than starting with a green aircraft without an interior already in place (8.12 months down-time and $25.0 M. to
$30.0 M price range) as we would have to spend quite a bit of effort in analyzing and validating the original interior.
On the other hand, if acceptable to your Principal, we were able to work around the existing interior distribution layout
and limit the refurbishment efforts to incorporating new materials and design features we would be in the 4.8 months
down-time and $5.0 M to $7.0 M budgetary price range.
EFTA_R1_01402469
EFTA02384601
Thanks and Best Regards!
Patricio
Patricio Altuna
Executive Vice President Sales & Marketing Associated Air Center
8321 Lemmon Ave
Dallas, TX, 75209
On Mon, Dec 1, 2014 at 7:24 AM, Alireza Ittihadieh
I have put my entire 58 aircraft experience on the table for free, I am not sure which pet of what I have advised you was
flawed that you didn't want to listen to?
There is no one who can direct you better than I can, I have delivered the most aircraft and you are getting opinions
expressed to you that are not supported by the required information.
The safest way to do what you want to do is in Basel as they have all the Original drawings. There is one place that could
manage this in the US.
I am still willing to assist you if you have the desire to.
V-BR
Alireza ITTIHADIEH
President & Chief Executive
From: Jeffrey E.
Sent: Monday, 1 December 2014 11:57
To: Alireza Ittihadieh
Subject:
2
EFTA_R1_01402470
EFTA02384602
we ve run into engineering issues, it seems the only place possible as they have the original stc would be basel . the
consensus is that as you said the engineering would be paramount . sone things installed no loner meet cert, under
new standards. will look more carefully in the next few days
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com <mailto:jeevacation@gmail.com> , and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com <mailto:jeevacation@gmail.com> , and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
3
EFTA_R1_01402471
EFTA02384603
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02384601.pdf |
| File Size | 224.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,005 characters |
| Indexed | 2026-02-12T15:55:16.614773 |