EFTA02379919.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Lvjet 4
>
Sent:
Thursday, January 9, 2014 4:57 AM
To:
jeevacation@gmail.com
Subject:
mounts
Jeffrey,
My records indicate Fwd mounts have been changed Dec 15, 2008 dur=ng engine overhaul,.
The L/H and R/H Aft mounts were changed in 1998 according to CMP repor= below,.,.
total time at this time: 8643
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712061 (P)
Isolator (Left Forward Mount, F=rward) - Removal / Installation
P/N: 94756-04 S/N: 5541
Event Category
Part (P) PN 94756.04 Enter Part Number
C/W
Hrs:
7178.6
Lnd:
3292
Date:
15 Dec 2008
Airframe
Vibration
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Freq <javascript:op=nCustomFreq(3415926);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: adal; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoadere34159261>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:15
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712061> OEM Labor Hours:4.0
Mx. Notes:
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Date:
Frequency Tolerance:<=font>
N/A
EFTA_R1_01393785
EFTA02379919
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install=20 Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:=nbsp;
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor=20 Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles [ =onths or Date]
TSN:
<javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> atd>
New Cos=:
$1,750.34
Overhau=ed:
Repaire=:
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install=20 Notes:
ATA 712061 Compliance History
Part ON #
Serial ON #
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Part OFF #
Serial OFF #
Remark / Malfunction Actual Labor
Facility
94756-04
ON : 5541
7,178.6 3,292
15 Dec 2008
0.00
<javascript:openComplHistE=itor( '3415926', 18903364)>
<javascript:openCompHistImageLoader( '3415926',='18903364' )>
OFF:
0.00
[view]
94756-04
ON :
3,601.0 1,644 11 Dec 1998
0.00
[view] <javascri pt:openComplHistE= itor(
'3415926', 1306914 )>
<javascript:openCompHistImageLoader( '3415926',='1306914' )>
OFF:
0.00
GAC-APP
ON : 94756-04
ON :
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3415926', 5283603 )>
<javascript:openCompHistImageLoader( '3415926',='5283603' )>
0.00
=/div>
[view]
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712062 (P)
Airframe
Vibration
Isolator (Left Forward Mount, A=t) - Removal / Installation
P/N: 94756-04 S/N: 5537
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 94756-04 Enter Part Number
C/W
2
EFTA_R1_01393786
EFTA02379920
Hrs:
7178.6
Ind:
3292
Date:
15 Dec 2008
Freq <javascript:op=nCustomFreq(3414655);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="Doclinks" style="width: 180px; font-family: adal; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageloadere34146551>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:18
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712062> OEM Labor Hours:4.0
Mx. Notes:
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Date:
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install=20 Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:=nbsp;
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor=20 Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles konths or Date ]
TSN:
<javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> <=td>
New Cos=:
$1,750.34
Overhau=ed:
Repaire=:
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install=20 Notes:
MAN
<https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
3
EFTA_R1_01393787
EFTA02379921
Part (P) PN 94756.94756.13 Enter Part Number
C/W
Hrs:
3601.0
Lnd:
1644
Date:
11 Dec 1998
Freq <javascript:op=nCustomFreq(3417398);>
SN
Mfg Ref Number: 71-01-00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: arial; font-sire: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoadere34173981>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:21
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712063> OEM Labor Hours:4.0
Mx. Notes: FREQ DETERMINED BY P/N
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
airframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type='checkbox" checked=""
value=3D"on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Date:
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Overhauled
TSN
ISO
TSR
Vendor:=nbsp;
HW Vers=on:
SW Vers=on:
Maint T=g:
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours
TSN:
TSR:
New Cos=:
Overhau=ed:
Repaire=:
Instal I =20 Status:
RB RebuiltR Repairedl InspectedM ModifiedN - NewO -
Current Part Run Time: Hours
Landings
Months
Mod Sta=us:
Part Warranty:
Labor=20 Warranty:
Airframe Time =t Install
Cycles I =onths or Date j
= <javascript:doNothing();>
</=> <javascript:doNothing();>
<javascript:doNothing();> <=td>
$1,747.28
4
EFTA_R1_01393788
EFTA02379922
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install=20 Notes:
MAN
<https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 13636.94756.0394756.13 Ent=r Part Number
C/W
Hrs:
3601.0
Lnd:
1644
Date:
11 Dec 1998
Freq <javascript:op=nCustomFreq(3417344);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoadert34173441>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:23
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712064> OEM Labor Hours:4.0
Mx. Notes: FREQ DETERMINED BY P/N
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Date:
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install=20 Status:
RB RebuiltR - Repairedl - InspectedM ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:=nbsp;
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor=20 Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles l =onths or Date)
TSN:
= <javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> <=td>
New Cos=:
$1,747.28
5
EFTA_R1_01393789
EFTA02379923
Overhau=ed:
Repaire=:
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install=20 Notes:
ATA 712064 Compliance History
Part ON It
Serial ON #
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Part OFF #
Serial OFF #
Remark / Malfunction Actual Labor
Facility
ON : 94756-13
ON : 2982
3,601.0 1,644 11 Dec 1998
0.00
<javascript:openComplHistE=itor( '3417344', 2664578)>
<javascript:openCompHistImageLoader( '3417344',='2664578' )>
OFF : 13636-94756-03 OFF: 0521
0.00
GAC-APP
ON : 13636-94756-03
ON : 0521
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3417344', 5751294)>
<javascript:openCompHistImageLoader( '3417344',&5751294' )>
0.00
=/div>
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712065 (P)
Isolator (Right Forward Mount, =orward) - Removal / Installation
P/N: 94756.04 S/N: 5536
Event Category
Part (P) PN 94756-04 Enter Part Number
C/W
Hrs:
7178.6
Lnd:
3292
Date:
15 Dec 2008
(view)
[view)
Airframe
Vibration
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Freq <javascript:op=nCustomFreq(3417286);>
SN
Mfg Ref Number: 71-01-00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: axial; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoaderc34172861>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:26
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712065> OEM Labor Hours:4.0
Mx. Notes:
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Date:
Frequency Tolerance:<=font>
N/A
6
EFTA_R1_01393790
EFTA02379924
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install=20 Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:=nbsp;
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor=20 Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles [ =onths or Date]
TSN:
<javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> atd>
New Cos=:
$1,750.34
Overhau=ed:
Repaire=:
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install=20 Notes:
ATA 712065 Compliance History
Part ON #
Serial ON #
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Part OFF #
Serial OFF #
Remark / Malfunction Actual Labor
Facility
94756-04
ON : 5536
7,178.6 3,292
15 Dec 2008
0.00
<javascript:openComplHistE=itor( '3417286', 18903366)>
<javascript:openCompHistImageLoader( '3417286',='18903366' )>
OFF:
0.00
[view]
94756-04
ON :
3,601.0 1,644 11 Dec 1998
0.00
[view] <javascri pt:openComplHistE= itor(
'3417286', 1372783 )>
<javascript:openCompHistImageLoader( '3417286',='1372783' )>
OFF:
0.00
GAC-APP
ON : 94756-04
ON :
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3417286', 5308553 )>
<javascript:openCompHistImageLoader( '3417286',='5308553' )>
0.00
=/div>
[view]
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712066 (P)
Airframe
Vibration
Isolator (Right Forward Mount, =ft) - Removal / Installation
P/N: 94756.04 S/N: 5538
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 94756-04 Enter Part Number
C/W
7
EFTA_R1_01393791
EFTA02379925
Hrs:
7178.6
Ind:
3292
Date:
15 Dec 2008
Freq <javascript:op=nCustomFreq(3417626);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="Doclinks" style="width: 180px; font-family: adal; font-si=e: 8pt;'500cumentsAMM 712061Task=20
Card <javascript:openComplmageloadere34176261>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:29
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712066> OEM Labor Hours:4.0
Mx. Notes:
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Date:
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Overhauled
TSN
TSO
TSR
Vendor:=nbsp;
HW Vers=on:
SW Vers=on:
Maint T=g:
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles konths or Date ]
<javascript:doNothing();>
</=> <javascript:doNothing();>
<javascript:doNothing();> <=td>
$1,750.34
TSN:
TSR:
New Cos=:
Overhau=ed:
Repaire=:
OEM Ven=or:
Part ON #
Part OFF #
Install=20 Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Current Part Run Time: Hours
Landings
Months
Mod Sta=us:
Part Warranty:
Labor=20 Warranty:
Airframe Time =t Install
BARRY CONTROLS AEROSPACE Install=20 Notes:
Serial ON #
Serial OFF #
ATA 712066 Compliance History
CW Hrs CW Cyc
CW Date
Actual Cost
Remark/ Malfunction Actual Labor
Facility
Work Order #
8
EFTA_R1_01393792
EFTA02379926
94756-04
ON : 5538
7,178.6 3,292 15 Dec 2008
0.00
<javascript:openComplHistE=itor( '3417626', 18903367)>
<javascript:openCompHistlmageloader( '3417626',='18903367' )>
OFF:
0.00
[view]
94756-04
ON :
3,601.0 1,644 11 Dec 1998
0.00
(view] <javascript:openComplHistE=itor(
'3417626', 1874829 )>
<javascript:openCompHistImageLoader( '3417626',='1874829' )>
OFF:
0.00
GAC-APP
ON : 94756-04
ON :
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3417626', 5478663 )>
<javascript:openCompHistImageLoader( '3417626',&5478663' )>
0.00
=/div>
[view]
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712067 (P)
Airframe
Vibration
Isolator (Right Aft Mount, Forw=rd) - Removal / Installation
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
P/N: 94756-13 S/N: 2993
Event Category
Part (P) PN 13636-94756-0394756.13 Ent=r Part Number
C/W
Hrs:
3601.0
Lnd:
1644
Date:
11 Dec 1998
Freq <javascript:op=nCustomFreq(3414842);>
SN
Mfg Ref Number: 71-01-00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: anal; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoaderc34148421>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:31
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712067> OEM Labor Hours:4.0
Mx. Notes: FREQ DETERMINED BY P/N
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">0ps Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Date:
Frequency Tolerance:<=font>
N/A
9
EFTA_R1_01393793
EFTA02379927
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install=20 Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:=nbsp;
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor=20 Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles [ =onths or Date]
TSN:
<javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> atd>
New Cos=:
$1,747.28
Overhau=ed:
Repaire=:
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install=20 Notes:
ATA 712067 Compliance History
Part ON #
Serial ON #
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Part OFF #
Serial OFF #
Remark / Malfunction Actual Labor
Facility
ON : 94756-13
ON : 2993
3,601.0 1,644 11 Dec 1998
0.00
<javascript:openComplHistE=itor( '3414842', 4484068)>
<javascript:openCompHistImageLoader( '3414842',='4484068' ►>
OFF : 13636-94756-03 OFF: 0518
0.00
GAC-APP
ON : 13636-94756-03
ON : 0518
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3414842', 6381279)>
<javascript:openCompHistImageLoader( '3414842',='6381279' )>
0.00
=/div>
[view]
[view]
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712068 (P)
Airframe
Vibration
Isolator (Right Aft Mount, Aft)=- Removal / Installation
P/N: 94756-13 S/N: 2994
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 13636.94756.0394756.13 Ent=r Part Number
C/W
Hrs:
3601.0
Lnd:
1644
Date:
11 Dec 1998
10
EFTA_R1_01393794
EFTA02379928
Freq <javascript:op=nCustomFreq(3415890);>
SN
Mfg Ref Number: 71.01.00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="Doclinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoader('3415890')>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:34
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712068> OEM Labor Hours:4.0
Mx. Notes:
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Date:
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
tYPe="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install=20 Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:=nbsp;
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor=20 Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours
TSN:
TSR:
New Cos=:
Overhau=ed:
Repaire=:
OEM Ven=or:
Part ON #
Part OFF #
Cycles I =onths or Date
<javascript:doNothing();>
</=> <javascript:doNothing();>
<javascript:doNothing();> <=td>
$1,747.28
BARRY CONTROLS AEROSPACE Install=20 Notes:
ATA 712068 Compliance History
Serial ON #
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Serial OFF #
Remark / Malfunction Actual Labor
Facility
ON : 94756.13
ON : 2994
3,601.0 1,644 11 Dec 1998
0.00
<javascript:openComplHistE=itor( '341589U, 3700147 )>
<javascript:openCompHistImageLoader( '3415890',='3700147' )>
OFF : 13636-94756-03 OFF: 0496
0.00
GAC-APP
(view)
11
EFTA_R1_01393795
EFTA02379929
ON : 13636-94756-03
ON : 0496
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3415890', 6087564)>
<javascript:openCompHistImageloader( '3415890',.'6087564' )>
0.00
=/div>
(view)
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712069 (P)
Airframe
Engine
Vibration Isolator (Left) - Clean = Inspect / Repair
120 MOS (C)=/span>
Due: End Of Month
Custom Frequency
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if>
59 Mos
Event Category
Special Inspection (M) PN Enter Par= Number
C/W
Used Due
Remains
Hrs:
7178.6
Lnd:
3292
Date:
15 Dec 2008
MO=
31 Dec 2018
59 Mos
Freq <javascript:op=nCustomFreq(3415308);> Next Due per Flight Utilization:&n=sp; 31 Dec 2018
SN
Mfg Ref Number: 71.01.00
Doc:
R=v:
=ssued: 01 Mar 1986
Section:
<=elect name="Doclinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712069Task=20
Card <javascript:openComplmageLoader('3415308')>
Watched Ops Package Last Upd=ted By: Martin Mroczek
Date: 1= Dec 2008 06:09
Est. =arts/Labor: $0.00/0.00 Hrs.
chttps://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712069> OEM Labor Hours:16.0
Mx. Notes:
Special Notation: Show Related=Codes
No Part Information
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
120 MOS
Next due was not adjusted.
<=tr>
Date:
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden">
Part Details
Manufac=urer:
Install=20 Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
ISO
TSR
12
EFTA_R1_01393796
EFTA02379930
Vendor:=nbsp;
HW Vers=on:
SW Vers=on:
Maint T=g:
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles
TSN:
TSR:
New Cos=:
Overhau=ed:
Repaire=:
OEM Ven=or:
Event Category
Special Inspection (M) PN Enter Par= Number
C/W
Used Due
Remains
Hrs:
7178.6
Mod Sta=us:
Part Warranty:
Labor=20 Warranty:
Airframe Time =t Install
Lnd:
3292
=onths or Date ]
= <javascript:doNothing();>
</=> <javascript:doNothing();>
<javascript:doNothing();> atd>
Install=20 Notes:
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> 59 Mos
Date:
15 Dec 2008
MO=
31 Dec 2018
59 Mos
Freq <javascript:op=nCustomFreq(3416340);> Next Due per Flight Utilization:&n=sp; 31 Dec 2018
SN
Mfg Ref Number: 71-01-00
Doc:
R=v:
=ssued: 01 Mar 1986
Section:
<=elect name="DocLinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712069Task=20
Card siavascript:openComplmageLoader('34163401)>
Watched Ops Package Last Upd=ted By: Martin Mroczek
Date: 1= Dec 2008 06:09
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712070> OEM Labor Hours:16.0
Mx. Notes:
Special Notation: Show Related=Codes
No Part Information
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
120 MOS
Next due was not adjusted.
<=tr>
Date:
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden">
Part Details
Manufac=urer:
Install=20 Status:
RB RebuiltR - Repairedl - InspectedM ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
ISO
13
EFTA_R1_01393797
EFTA02379931
TSR
Vendor:=nbsp;
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor=20 Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles [ =onths or Date)
TSN:
= <javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> <=td>
New Cos=:
Overhau=ed:
Repaire=:
OEM Ven=or:
Install=20 Notes:
MA 712070 Compliance History
Part ON #
Serial ON St
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Part OFF #
Serial OFF St
Remark / Malfunction Actual Labor
Facility
7,178.6 3,292
15 Dec 2008
0.00
[view) <javascript:openComplHistE=itor( '3416340',
18903347)>
<javascript:openCompHistImageLoader( '3416340',='18903347' )>
0.00
3,601.0 1,644 11 Dec 1998
0.00
[view] <javascript:openComplHistEritor( '3416340',
2556375)>
<javascript:openCompHistImageLoader( '3416340',&2556375' )>
0.00
GAC-APP
1,020.0 413
05 Apr 1992
0.00
[view] <javascript:openComplHistE=itor( '3416340',
5682341)>
<javascript:openCompHistlmageloader( '3416340',='5682341' ►>
0.00
=/div>
712071 (P)
Airframe
Engine Isolator Mount Bolt Assembly (Left= Forward) - Scrap
P/N: 94756-07 S/N: 5302
8000 HRS</=pan>
Tolerance
+500 Hr Over Flight
MAN <https://cmp.mygulfstream.com/images/dotGree=.gif>
6540.0 Hrs
<=div>
712072 (P)
Airframe
Engine Isolator Mount Bolt Assembly (Righ=, Forward) - Scrap
P/N: 94756-07 S/N: 5319
8000 HRS</=pan>
Tolerance
+500 Hr Over Flight
MAN <https://cmp.mygulfstream.com/images/dotGree=.gif>
6540.0 Hrs
14
EFTA_R1_01393798
EFTA02379932
Event Category
Replacement (X)
PN 94756-07' Enter Part Number
C/W
Due
Remains
Hrs:
7178.6
15178.6
6540.0
Lnd:
3292
Date:
15 Dec 2008
Freq <javascript:op=nCustomFreq(18270374);> Next Due per Flight Utilization:&n=sp; 31 Oct 2035
SN
Mfg Ref Number: 71.01.00
Doc: GIV AMM Rev: =4 Issued: 3= Apr 2013
Section: 05-02-00
<=elect name="Doclinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712071Task=20
Card <javascript:openComplmageLoadert182703741)>
Watched RII
Est. =arts/Labor: $0.00/0.00 Hrs. OEM Labor Hours:0.0
Mx. Notes: compliance transfered from code 712018 Special Notation: Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:afont>
8000 Hrs
Next due was not adjusted.
<=tr>
Date:
Frequency Tolerance:<=font>
+500 Hr Over Flight </=ont>
= =input name="currentCyclesComponent" type="hidden" value="4005.000"> =input name="isPartRel" type="hidden"
value="1"> S ServiceableTC - Time Continuedl - InspectedM - ModifiedN - NewO - Overhauled Current Part Run Time:
Hours
Landings
Months
TSN
ISO
TSR
Vendor:=nbsp;
HW Vers=on:
SW Vers=on:
Maint T=g:
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles i=onths or Date]
<javascript:doNothing();>
</=> <javascript:doNothing();>
<javascript:doNothing();> atd>
$635.64
TSN:
TSR:
New Cos=:
Overhau=ed:
Repaire=:
OEM Ven=or:
Vendor =D:
V000020996
Mod Sta=us:
Part Warranty:
Labor=20 Warranty:
Airframe Time =t Install
BARRY CONTROLS AEROSPACE Install=20 Notes:
Compliance Remarks
FOR REFERENCE ONLY
P/N 94756-07. Not to exceed 8500 hours. Reco=mended at scheduled engine overhaul.
15
EFTA_R1_01393799
EFTA02379933
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA02379919.pdf |
| File Size | 1330.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 27,581 characters |
| Indexed | 2026-02-12T15:55:18.339113 |