Back to Results

EFTA02388044.pdf

Source: DOJ_DS11  •  Size: 176.8 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Richard Kahn < Sent: Tuesday, May 23, 2017 11:18 AM To: Jeffrey Epstein Subject: Fwd: Richard Kahn HBRK Associates Inc. 575 =exington Avenue, 4th Floor 2 Begin forwarded message: From: =/b>Amy Dempsey Subject: =/b>Re: Date: =/b>May 23, 2017 at 6:50:19 AM =DT To: =/b> Cc: Hugo Hodge We are presenting at =he Interagency Meeting on the 21st of June and submitting the next =ay. I have finishing up the EAR now. I still need the final =tuff from Hugo, but I take it that you got him the generator =nformation so he can finish those things up. We are actually out =oday and tomorrow finishing the surveys for the new layout... Amy Claire Dempsey, =.A. President, Bioimpact, Inc. P.O. Box 132 =ingshill St. Croix, U.S. Virgin Islands 0O851 On Mon, May 22, 2017 at 6:26 =M, Richard Kahn wrote: .: > any updates on moving this =orward EFTA_R1_01410144 EFTA02388044 please advise thank =ou Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, =Y 10022 on the boat so no =S1). On May 16, 2017, at 7:49 AM, Amy Dempsey =rote: Sorry I was with the COE from 2pm on and will =e again today, we are doing site visits (but not Amy Claire Dempsey, =.A. President, Bioimpact, Inc. P.O. Box 132 =ingshill St. Croix, U.S. Virgin Islands 00851 On Mon, May 15, 2017 at 6:50 =M, Hugo Hodge wrote: Good evening All, While we wait for everyone to confirm availability for the =all, I have received some specs for the generators. On the first =lance, I believe it can work but it will require some re-designing. The = generators will have to work in parallel and it will require a =edesign of the switchgear on both islands. Additionally some other =quipment, like step up transformers, will be needed for the new scheme =o work. This work is outside of the agreed upon scope and I will need =o send you a proposal to do this design. This makes it a good thing that we =idn't order the switchgear. I will also need to submit the new design =o WAPA for approval. HH On Mon, May 15, 2017 at 7:19 AM, Hugo Hodge < > =rote: 2 EFTA_R1_01410145 EFTA02388045 Good morning All, Amy is correct. I requested additional information about the =enerator to determine if there will be issues with it being the backup =or both islands. Additionally, we have not ordered any of the switchgear, =able, etc. for the project. HH On Sun, =ay 14, 2017 at 3:17 PM, Amy Dempsey <bioimpact.islands.vi@gmail.com> =rote: I =hink we are quickly wrapping everything up, there were some things Hugo =eeded in relationship to the existing generator and its ability to =arry both islands etc„ but finally have the landings set which allows =e to finalize all my pieces. and get the sections finished for the =AR. Amy Claire Dempsey, =.A. President, Bioimpact, Inc. P.O. Box 132 =ingshill St. Croix, U.S. Virgin Islands 00851 On Sun, May 14, 2017 at 3:04 =M, jeffrey E. <jeevacation@gmail.com> wrote: are we set? please note The information contained in this =ommunication is confidential, may be attorney-client =rivileged, may constitute inside information, and is =ntended only for the use of the addressee. It is the =roperty of JEE Unauthorized use, disclosure =r copying of this communication or any part thereof is =trictly prohibited and may be unlawful. If you have =eceived this communication in error, please notify us =mmediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this =ommunication and all copies thereof, 3 EFTA_R1_01410146 EFTA02388046 including all =ttachments. copyright -all rights reserved 4 EFTA_R1_01410147 EFTA02388047

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02388044.pdf
File Size 176.8 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,642 characters
Indexed 2026-02-12T15:56:03.990810
Ask the Files