Fwd: Proposed Schedule for Better Roads Paving Project - April 8, 2015
attached was daphne proposed schedule for asphalt and =arging
please note =oyson has commitments for beginning of july with st john =estival
please =dvise if we should tweak for mid July / august 2015 thank you
Richard Kahn
HBRK Associates Inc.
Forwarded m
-
From: Daphne =allace
Date: Wed, =pr 8, 201 at 4:20 PM
Subject: Proposed Schedule for =etter Roads Paving Project - April 8, 2015
To: Jeffrey =pstein <jeevacation@gmail.com <mailto:jeevacation@gmail.com»
Greetings=Sir,
As =romised, for your review and comments, is a summary of a proposed plan =nd schedule for the Road Paving
=roject:
Week of =onday, June 8, 2015: Better Roads will mobilize =heir equipment and lighter materials, using Boyson,
spend =his first week prepping, to begin laying the asphalt the week of June =5th.
EFTA_R1_01422011
EFTA02393459
Big N =ould be the auxiliary vessel for transportation throughout the work day =n the event Better Roads needs
an extra load for that day, or =f they need to transport support equipment.
Better Roads will coordinate with L.S1 on transportation needs. In the event that Big N is not =vailable, we will
work the extra trips in to Boyson's =chedule.
Presuming=that the scope of the project is still the same, Better Roads estimates=transporting 75-80 truckloads
of asphalt in total for the project. They =ill need 5-7 truckloads per day. Better Roads has =lanned a 5 day per week
schedule, and will leave Saturdays and Sundays =or "rain days".
Boyson can move 2-3 trucks per trip. To =atch the high tide, Better Roads will be at Red Hook at 6:30 am with all
6 =oads. Boyson will take the first =roup (2-3 trucks), turn right around and deliver the second group, and = third group if
needed. Boyson would then come back before the end of the =ay to return the 6 trucks to STT.
Better Roads will =eserve the trucks for this job only, so that Boyson does not have to make extra runs to return
=mpty trucks for other jobs on STT.
Better Roads was =sked, and they are willing to transport materials and/or supplies back =rom LSJ on return
trips to St. =homas.
The =roposed schedule outlined for your review is as follows:
Week 1: =onday, June 8 to Friday, June 12 - Using Boyson -Better Roads mobilizes equipment to LSJ, complete
prep =ork on LSJ
Week 2: =onday, June 15 to Friday, June 19 - Using Boyson -Better Roads paving (30 loads)
2
EFTA_R1_01422012
EFTA02393460
Week 3: =onday, June 22 to Friday, June 26 - Boyson
- =etter Roads (30=loads)
Week 4: Monday, June 29 to Wednesday, July 1- Boyson
- Better Roads (20 loads)
Respectfully submitted,
Daphne
3
EFTA_R1_01422013
EFTA02393461
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Email Addresses
Document Details
| Filename | EFTA02393459.pdf |
| File Size | 133.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,805 characters |
| Indexed | 2026-02-12T16:06:05.692352 |