Back to Results

EFTA02391775.pdf

Source: DOJ_DS11  •  email/external  •  Size: 57.8 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: Lvjet Sent: Friday, January 16, 2015 12:06 AM To: jeevacation@gmail.com Subject: flap update Jeffrey, Gulfstream te=h's just went to hotel,. we worked as much as we could =ntil dark. so far, The Avionics Tech informs t=e electrical system is doing what its suppose to, we =ave proven the flap selector valve is passing fluid as it =hould, so flap selector valve is not the problem,. =div> precautionary, We ordered a PDU, Power Distribution =nit,. located in Main wheel well, this is hydraulic power m=tor that drives flap and Stabilizer. tomorrow the plan is t= disconnect each flap drive unit, and manually turn to chec= freedom of travel,. two per flap,. these flap actuators =ave a Blow back mechanism which prevents flaps from retractin= in flight in case of hydraulic failure or drive brake,. =/div> then we will disconnect the stab drive unit and=20check for freedom of movement. at this point =ech support is thinking PDU unit internal failure, ours is=20original 1988,. But very low failure item. gutt =s tells me one of flap dive actuators is binding, or B=ow back mechanism is engaging, we will determine this tomorro=,. makes sense since we can extend,. better update tomorrow </=iv> thx. Larry 1 EFTA_R1_01418150 EFTA02391775

Document Preview

Extracted Information

Dates

Email Addresses

Document Details

Filename EFTA02391775.pdf
File Size 57.8 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,270 characters
Indexed 2026-02-12T16:06:20.174797

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files