jeeyacation@gmail.com[jeeyacation@gmail.com]; Ken-Hao Hsu
Cc:
Tom Sze
Bryan
Oakes
From:
Warwick Wicksman
Sent:
Tue 8/10/2010 5:38:52 PM
Subject: Re: LSJ Update
Great. Will call in a couple of hours when I am out of meetings and back in the office.
Thanks,
Warwick Wicksman
Principal
Sent from my BlackBerry Device.
From: Gary Kerney <
To: Warwick Wicksman• eevacation@ mail.com < eevacation@gmail.com>; Ken-Hao Hsu
Cc:
Tom Sze; Bryan Oakes
Sent: Tue Aug 10 10:32:01 2010
Subject: RE: LSJ Update
Warwick
Jeffrey has some new thoughts on the theater,best described on the phone.Please call me
Thanks
Gary
From: Warwick Wicksman (manta:
Sent: Mon 8/9/2010 12:49 PM
To: Ga
Kerne •
Ken-Hao Hsu
Cc:
Tom Sze; Bryan Oakes
Subject: RE: LSJ Update
I do not know any specific operators in the Palm Beach area, but I can look into it. Is that
the preferred location? Or is New York better?
Warwick
Warwick Wicksman, AIA
Principal
Gensler
2500 Broadway
Suite 300
EFTA_R1_01466902
EFTA02407511
Santa Monica, California 90404
USA
From: Gary Kerney
Sent: Monday, August 09, 2010 6:32 AM
To: Warwick Wicksman• •eeyacation@gmail.com; Ken-Hao Hsu
Cc:
Tom Sze; Bryan Oakes
Subj
:
:
p a e
Warwick
Jeffrey would like to visit an existing theater in the 25' range.Do you have the ability to get him in to see
examples of various sizes of theaters?
Gary
From: Warwick Wicksman [mailto
Sent: Sat 8/7/2010 1:46 PM
To: jeevacation© mail.comi- Ken-Hao Hsu
Cc: Gary Kerney;
Tom Sze; Bryan Oakes
Subject: Re: LSJ Update
We can look at that. Gary mentioned you may be considering a 25' wide screen, in lieu of 30'. I
suggested to Doug that someone lay that out for you to see. It would also reduce the size of the room
proportionally.
Do you have any comments on the view from the garden to the screening room - the idea of an 8' garden
wall there?
Thanks,
Warwick Wicksman
Principal
Sent from my BlackBerry Device.
From: Jeffrey Epstein <jeevacation@gmail.com>
To: Ken-Hao Hsu
Cc: Gary Kerney <
III=
>; Doug Schoettle
Warwick Wicksman; Tom Sze; Bryan Oakes
EFTA_R1_01466903
EFTA02407512
Sent: Sat Aug 0710:18:08 2010
Subject: Re: IS) Update
can we change , the height of the screening room, should be lowered or raised, to tweak the
massing.
On Thu, Aug 5, 2010 at 8:25 PM, Ken-Hao Hsu
wrote:
Team,
To follow up Wanvick's email, please see attached revised images for your reference.
These images reflect smaller screening room.
Thanks,
Ken-Hao Hsu I.EED AP
Associate
Gensler
2500 Broadway
Suite 300
Santa Monica CA 90404
From: Gary Kerney [mailto
Sent: Thursday, August 05, 2010 4:30 PM
To: Warwick Wicksman: Doug Schoculc
Cc: Tont Sze: Bryan Oakes: Ken-Hao Hsu: Jeffrey Epstein
Subject: RE: LSJ Update
Warwick
These look good,we'll understand all the stairs in the screen complex better when we see the 3D renderings, as well
the scale of the screening room .when the renderings arc ready send to all.
Thanks
Gary
EFTA_R1_01466904
EFTA02407513
From: Warwick Wicksman [mailto:
Sent: Thu 8/5/2010 6:17 PM
To: Gary Kerney: Doug Schoenle
Cc: Toni Sze: Bryan Oakes: Ken-Hao Hsu
Subject: LSJ Update
Gary,
Please review these draft sketches, and let me know if you need me to add any more info before you present them to
Mr. Epstein this weekend! i have not sent them to him yet. Ken-Hao will be sending you the 3D views later
today — as soon as they are ready. I have attached the plan views only.
With these sketches, we have exhausted the re-design services approved Work Authorization I. These are
intended to be programmatic conceptual drawings. When we move forward with the next phase, we will refine the
layouts, and get into the details of the design.
Please note:
•
The layouts are based upon previous Option I, sent 7/28/10.
•
We have revised the exterior stairs and circulation per our discussions.
•
We have provided options for the Kitchen windows.
•
We have revised the road, to reflect the corrected site plan we received yesterday, 8/4/10, with the relocated
service road. Note. this did impact the previous layout a bit.
•
I added the door at the north end of the east wall of the kitchen addition, per my conversation with Doug this
morning.
The two "partial site plans" attached reflect the two different screening room sizes. One has a 30' screen, per our
original design. The other has a 25' screen, as I discussed with Gary. I recommend someone mock up the two
sizes for Mr. Epstein's review, perhaps in the living room. to confinn the desired screen size. The screening room
area is not completely laid out, as we need to dig into the design of that area in greater detail, once we set the
location and screen size.
If this layout is approved, we can prepare a new proposal to provide complete construction documents, based on
EFTA_R1_01466905
EFTA02407514
this layout, including all of our consultants. If we need to make minor adjustments, we can accommodate that as
we move forward. If we need to make major adjustments, I can prepare a new proposal for additional conceptual
re-design services.
Please call me or email me if you have any questions!
Thanks,
Warwick
Warwick Wicksman, AIA
Princi al
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
*************
**********
************************************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jecvacationOsmail.com and
destroy this communication and all copies thereof,
including all attachments.
EFTA_R1_01466906
EFTA02407515
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA02407511.pdf |
| File Size | 311.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,990 characters |
| Indexed | 2026-02-12T16:16:43.593851 |