Back to Results

EFTA02407491.pdf

Source: DOJ_DS11  •  Size: 290.0 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: jeevacati Cc: Oakes From: Gary Kerney Sent: Tue 8/10/2010 5:32:01 PM Subject: RE: LSJ Update Warwick Wicksma Warwick Jeffrey has some new thoughts on the theater,best described on the phone.Please call me Thanks Gary From: Warwick Wicksman Sent: Mon 8/9/2010 12:49 PM To: @gmail.com; Ken-Hao Hsu Cc: ; Tom Sze; Bryan Oakes Subject: RE: LS) Update ryan I do not know any specific operators in the Palm Beach area, but I can look into it. Is that the preferred location? Or is New York better? Warwick Warwick Wicksman, AIA Principal 310.449.5790 Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA From: Gary Kerney Sent: Monday, August , 1 : To: • cation@gmail.com; Ken-Hao Hsu Cc: Torn Sze; Bryan Oakes Subject: RE: LSJ Update Warwick EFTA_R1_01466880 EFTA02407491 Jeffrey would like to visit an existing theater in the 25' range.Do you have the ability to get him in to see examples of various sizes of theaters? Gary From: Warwick Wicksman Sent: Sat 8/7/2010 1:46 P To: leevacation@gmail.coM; Ken-Hao Hsu Cc: Gary Kerney; • Tom Sze; Bryan Oakes Subject: Re: LSJ Update We can look at that. Gary mentioned you may be considering a 25' wide screen, in lieu of 30'. I suggested to Doug that someone lay that out for you to see. It would also reduce the size of the room proportionally. Do you have any comments on the view from the garden to the screening room - the idea of an 8' garden wall there? Thanks, Warwick Wicksman Principal Sent from my BlackBerry Device. From: Jeffrey Epstein <jeevacation@gmail.com> To: Ken-Hao Hs Cc: Gary Kemey Warwick Wicicsman; Tom Sze; Bryan Oakes Sent: Sat Aug 0710:18:08 2010 Subject: Re: IS) Update Doug Schoettle can we change , the height of the screening room, should be lowered or raised, to tweak the massing. On Thu, Aug 5, 2010 at 8:25 PM, Ken-Hao Hsu wrote: Team. To follow up Warwick's email, please see attached revised images for your reference. These images reflect smaller screening room. Thanks. EFTA_R1_01466881 EFTA02407492 Ken-Hao Hsu LEED AP Associate Gensler 2500 Broadway Suite 300 Santa Monica CA 90404 From: Gary Kerney (mailul=il l Sent: Thursday, August 05, 2010 4:30 PM To: Warwick Wicksman; Doug Schoettle Cc: Tom Sze; Bryan Oakes; Ken-Hao Hsu; Jeffrey Epstein Subject: RE: LSJ Update Warwick These look good,we'll understand all the stairs in the screen complex better when we see the 3D renderings, as well the scale of the screening room .when the renderings arc ready send to all. Thanks Gary From: Warwick Wicksman Sent: Thu 8/5/2010 6:17 P To: Gary Kerney; Doug Schoettle Cc: Tont Sze: Bryan Oakes: Ken-Hao Hsu Subject: LSJ Update Gary, Please review these draft sketches, and let me know if you need me to add any more info before you present them to Mr. Epstein this weekend! I have not sent them to him yet. Ken-Hao will be sending you the 3D views later EFTA_R1_01488882 EFTA02407493 today — as soon as they are ready. 1 have attached the plan views only. With these sketches, we have exhausted the re-design services approved Work Authorization 1. These arc intended to be programmatic conceptual drawings. When we move forward with the next phase, we will refine the layouts, and get into the details of the design. Please note: • The layouts are based upon previous Option I, sent 7/28/10. • We have revised the exterior stairs and circulation per our discussions. • We have provided options for the Kitchen windows. • We have revised the road, to reflect the corrected site plan we received yesterday, 8/4/10, with the relocated service road. Note, this did impact the previous layout a bit. • I added the door at the north end of the east wall of the kitchen addition, per my conversation with Doug this morning. The two "partial site plans" attached reflect the two different screening room sizes. One has a 30' screen, per our original design. The other has a 25' screen, as I discussed with Gary. I recommend someone mock up the two sizes for Mr. Epstein's review, perhaps in the living room, to confirm the desired screen size. The screening room area is not completely laid out, as we need to dig into the design of that area in greater detail, once we set the location and screen size. If this layout is approved, we can prepare a new proposal to provide complete construction documents, based on this layout, including all of our consultants. If we need to make minor adjustments, we can accommodate that as we move forward. If we need to make major adjustments, I can prepare a new proposal for additional conceptual re-design services. Please call me or email me if you have any questions! Thanks, Warwick Warwick Wicksman, AIA Principal 310.449.5790 EFTA_R1_01466883 EFTA02407494 Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. EFTA_R1_01466884 EFTA02407495

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02407491.pdf
File Size 290.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 5,510 characters
Indexed 2026-02-12T16:17:59.667895
Ask the Files