Back to Results

EFTA02415505.pdf

Source: DOJ_DS11  •  Size: 66.7 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Jeevacationueevacation@gmail.com] From: Gary Kerney Sent: Wed 11/10/2010 2:43:17 PM Subject: RE: LSJ Jeffrey I put a rough estimate together for everything on the Fl plan including the two cottages for about $4,500,000 based on a bunch of assumptions I do this at this stage to give you the order of magnitude and give us a basis to analyze the architects fees From: Jeevacation [mailtoleevacation@gmail.com] Sent: Wed 11/10/2010 6:11 AM To: Gary Kerney Subject: Re: LSJ Yes fl Sorry for all the typos .Sent from my iPhonc On Nov 10, 2010, at 1:07 PM, "Gary Kerney" < Jeffrey wrote: were the 11/3 Fl or F2 schemes close enough to your concept to have Gensler take one of them to the next level and contract? also should they be producing a schematic for the SPA to review From: Warwick Wicksman [mat Sent: Tue 11/9/2010 7:27 PM To: Gary Kerney; Doug Schoettle Cc: Tom Sze Subject: LS) Guys, any word from Jeffrey on how he wants to proceed? Warwick Warwick Wicksman, AIA Princi al Gensler EFTA_R1_01479019 EFTA02415505 2500 Broadway Suite 300 Santa Monica, California 90404 USA EFTA_R1_01479020 EFTA02415506

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02415505.pdf
File Size 66.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,151 characters
Indexed 2026-02-12T16:25:55.268285
Ask the Files