EFTA02409028.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
Jeevacation eevacation@gmaitcomi
From:
Sent
Subject: Gary Kemey's To Do List
Date Updated Nov. 19,2010
Name: Gary
LSJ
Library
Sun 11/21/2010 2:43:12 AM
Jeffrey's To Do List
Outstanding Issues:
I .Ceiling Treatment: Ion working
2. Cabinet finishes
3. Floor finishes — open issue
Master Suite:
Status Interior
I. Thassos starting 9/20 takes 2 months(11/20)
2. Wood floors 11/20 to 12/20
3. Occupy 1/20
Outstanding Issues
I.out side shower
will mock up for next visit
2.1ites over bed
Doug
EFTA_R1_01469001
EFTA02409028
3.1ighting in bedroom EDoug
Kitchen:
Wall finish?
Complete 2/28/11
Laundry:
1.complete 1211
Cottages:
NVall refinished for Ion 11/25/10
Marble vanities 11/25/10
Outstanding Issues:
1.Shower Design Doug
Mechanical Electrical:
Status under way should complete by
Mechanical Dcsal:
Status under way should complete by Nov 30
POOL/THEATER
Leff planning
POP'S GARDEN
I.underway
Dock House/Floating Dock
/.plans being submitted 9/15
Hanger
EFTA_R1_0 1469002
EFTA02409029
Have been in contact with the Butler building rep. for the carrib on hold pending approval
Ca14/1
Status submitting by July 1
1.Plans go in the 6/30being reviewed
2.Assume approval by September 30
3.Construction plans by November 31
4.Permits by January 30
5.Pool by June 30
6.Cottage by August 31
7.Music room by June 30
8. Tennis by April 30
I.Dejonge will have plan by 9/1/10
EFTA_R1_0 1469003
EFTA02409030
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA02409028.pdf |
| File Size | 101.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,459 characters |
| Indexed | 2026-02-12T16:26:42.393034 |