Back to Results

EFTA02409028.pdf

Source: DOJ_DS11  •  Size: 101.4 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Jeevacation eevacation@gmaitcomi From: Sent Subject: Gary Kemey's To Do List Date Updated Nov. 19,2010 Name: Gary LSJ Library Sun 11/21/2010 2:43:12 AM Jeffrey's To Do List Outstanding Issues: I .Ceiling Treatment: Ion working 2. Cabinet finishes 3. Floor finishes — open issue Master Suite: Status Interior I. Thassos starting 9/20 takes 2 months(11/20) 2. Wood floors 11/20 to 12/20 3. Occupy 1/20 Outstanding Issues I.out side shower will mock up for next visit 2.1ites over bed Doug EFTA_R1_01469001 EFTA02409028 3.1ighting in bedroom EDoug Kitchen: Wall finish? Complete 2/28/11 Laundry: 1.complete 1211 Cottages: NVall refinished for Ion 11/25/10 Marble vanities 11/25/10 Outstanding Issues: 1.Shower Design Doug Mechanical Electrical: Status under way should complete by Mechanical Dcsal: Status under way should complete by Nov 30 POOL/THEATER Leff planning POP'S GARDEN I.underway Dock House/Floating Dock /.plans being submitted 9/15 Hanger EFTA_R1_0 1469002 EFTA02409029 Have been in contact with the Butler building rep. for the carrib on hold pending approval Ca14/1 Status submitting by July 1 1.Plans go in the 6/30being reviewed 2.Assume approval by September 30 3.Construction plans by November 31 4.Permits by January 30 5.Pool by June 30 6.Cottage by August 31 7.Music room by June 30 8. Tennis by April 30 I.Dejonge will have plan by 9/1/10 EFTA_R1_0 1469003 EFTA02409030

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02409028.pdf
File Size 101.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,459 characters
Indexed 2026-02-12T16:26:42.393034
Ask the Files