Back to Results

EFTA02412198.pdf

Source: DOJ_DS11  •  Size: 155.1 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Gary Kemey Cc: Jeffrey Epstein[jeevacation©gmail.com] From: Shelley Sent Mon 6/14/2010 8:08:41 PM Subject.• Re: Island - June like this On Jun 14, 2010, at 10:10 AM, Gary Kerney wrote: no attachment Gary From: Sent: Sun 6/13/2010 7:37 PM To: Cc: Gary Kerney; Doug Schoettle Subject: Island - June Hi all, Gary did a great job of putting this together. I've added some comments below and the specific things I'm taking care of in a separate email. Thank you, EFTA_R1_01473745 EFTA02412198 PLANS Pick up latest marked drawings from Robert's °nice on Tuesday 15th. will make copy and send to Doug this week. DOCK Sec attached image. LIBRARY Status interior 1.interiors complete by construction Outstanding issues 1.ceilina treatment Ion to visit week after next to start painting • work duration 2- 3 weeks • estimated completion date July 8th 2.cabinet finishes awaiting panel from Paris. delay now due in this week by the 19th 3.floor finishes Je to decide on next visit to Island. decision made by July 1st. Status exterior 1.courtyard paving underway complete by the July 31 2.irragation main line underway complete by July 15 3. wall sconces to replace existing, will get info on them from Robert's office Outstanding issues 1.landscape plans a.plants Igala to fill in area behind tiki hut with plants we chose awaiting new images from him b.irragatiion plans c.lighting will send sample lighting options via email this week 2.Igala has trees tagged ready for delivery as soon as barge is ready MASTER SUITE Status interior 1.const under way ,subject to decisions being made should finish by Oct 31 Outstanding issues 1.steam bench 2.out side shower 3.lites over bed EFTA_R1_01473746 EFTA02412199 4.lighting in bedroom 5.electrical in bath area 6.tub deck and surround 7.selection of wood floor 8.sourcing thassos slabs 9.powderroom vanity plan 10.shop drawings for stone i.order ru for bathroom Status exterior 1.wall under way, complete by Aug 31 Outstanding issues 1.landscape plans..liting irr. KITCHEN Status 1.assume we get permit by July 1 should be complete by Nov.31 Outstanding issues 1.kitchen design 2.stair and wall design to master LAUNDRY 1.assume we get permit July 1 should complete by Oct 31 COTTAGES 1.const underway should complete by Sept 30 Outstanding issues 1.shower design Other guest cottage to be built in same complex: revisit idea on next visit MAIN HOUSE REMODEL Status no estimate to compleation til program complete 1.courtyard side plan final,proceeding 2.roofing proceeding Outstanding issues 1.north side program MECHINICAL ELECTRICAL Status under way should complete by Sept 30 EFTA_R1_01473747 EFTA02412200 MECHANICAL DESAL Status under way should complete by Nov 30 POOL/THEATER 1.Gensler allow three months for plans 2.two months for permits Nov 30 3.pool by Mar 31 4. theater by Jun 30 EFTA_R1_01473748 EFTA02412201

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA02412198.pdf
File Size 155.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,960 characters
Indexed 2026-02-12T16:26:47.819115
Ask the Files