EFTA02415516.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
Jeffrey Epsteinfieevacation©gmail.com]
From:
Emad Hanna
Sent:
Thur 11/4/2010 1:27:07 PM
Subject: RE: LSJ: Big N
Jeffrey,
I have done some research on this and here is what I have found.
When we purchased the barge in 2007 we installed a new Hydraulics system costing about $ 53,000. The
rust on the cylinders has caused the seal to break therefore these repairs must be done and these
estimates are not 100% solid and the cost could change we won't know until its taken apart and from
speaking to Bill Bowles and Boscoe these estimates do not seem out of line for the work that will be
done. Also from speaking to them if we had some kind of a regularly scheduled maintenance programs
where we take the barge out of action and do regular upkeep and checkups this may have been caught a
bit earlier and may not have been as severe. The barge is the lifeline of 151 and we need to make
adjustments going forward to take it out of commission for regular inspections and maintenance and
this goes for all the equipment and machinery so we don't wait until its broke to fix it.
Brice has the barge scheduled to go in for Monday
Thank you
Emad Hanna
Project Controller
HBRK Associates
301 East 66th St
Suite 10F
New York, NY 10065
Cell
LS) Office
St. Thomas Office
NY Office
EFTA_R1_01479030
EFTA02415516
From: Jeffrey Epstein [mailto:jeevacation@gmail.com]
Sent: Wednesday, November 03, 2010 4:36 PM
To: Emad Hanna
Subject: Fwd: LSJ: Big N
Forwarded message
From: brice gordon
Date: Wed, Nov 3, 2
at
Subject: LSJ: Big N
To: jeevacation@gmailsom
Cc: Gary Kerney
Jeffrey
Attached are photo's of the Barge Gate, Hydraulic Rams and housing
Big N
Basic the boxes the hold the Rams in place have cracked and the Top
to be re fabricated and strengthened. Please note the crack on the top
the way along the top
Estimated Costs of repairs arc:
Lift Gate repair
$7000.00
Hydraulic Ram Boxes (2)
$6800.00
Hydraulic Rams (2)
TBA
that need to be repaired on
of the Barge Gate will need
of the gate extends 2/3 rd's
Hydraulic Rams, once they are removed Haul Over will be able estimate Repairs,
EFTA_R1_01479031
EFTA02415517
probably looking at around $1500 per Ram
Have scheduled the barge to be down next week for repairs, The General ( Boyson) will used for
any trips.
can we proceed with repairs
Brice
********************************
***************************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jecvacationOgmail.com, and
destroy this communication and all copies thereof,
including all attachments.
EFTA_R1_0 1479032
EFTA02415518
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA02415516.pdf |
| File Size | 166.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,033 characters |
| Indexed | 2026-02-12T16:27:13.792461 |