Back to Results

EFTA02412977.pdf

Source: DOJ_DS11  •  email/external  •  Size: 84.6 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

To: Jeffrey Epsteinfleevacation©gmail.com] From: Silvina Royston Sent: Wed 4/15/2009 12:31:46 PM Subject: RE: Master Suite Expansion Jeffrey, I will review all issues regarding Master Suite terrace, steps, etc, today. I am right now sketching out road ideas and will forward this morning. Silvina From: Jeffrey Epstein [mailto:jeevacation@gmail.com] Sent: Wednesday, April 15, 2009 8:27 AM To: Silvina Royston Subject: Re: Master Suite Expansion with the new elevation does it not look above equiptment?,„ if not eliminate... also we have to deal with he terrace and how it continues„ arc steps out. in addtion , when will i see your road ideas? On Wed, Apr IS, 2009 at 8:20 AM, Silvina Royston •= > wrote: Jeffrey, We staked out the footprint of the Master Suite expansion. Please review attached photos. Orange sprayed line demarcates the perimeter of building. As you can see from Photo 02, the new back wall is only several feet from existing electrical lines and transformer equipment. This affects: EFTA_R1_01474962 EFTA02412977 I. Window at steam shower. We can: a. Keep window as in Pinto elevation and build a wall to conceal equipment. This alleyway, about 4' deep, can be planted and we can grow vines on the wall for greenery. b. Keep window but instead of clear glass install translucent glass for light, no view. c. Eliminate window. Let me know your thoughts. Regards, Silvina EFTA_R1_01474963 EFTA02412978

Document Preview

Extracted Information

People Mentioned

Dates

Email Addresses

Document Details

Filename EFTA02412977.pdf
File Size 84.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,458 characters
Indexed 2026-02-12T16:27:40.371369

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files