Back to Results

EFTA02412285.pdf

Source: DOJ_DS11  •  Size: 139.6 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Jeffrey Epsteingeevacation mail.com] Cc: Schoettle From: Sent: Subject: Island - June Hi all, Sun 6/13/2010 11:37:53 PM ; Gary Kemey , Doug Gary did a great job of putting this together. I've added some comments below and the specific things I'm taking care of in a separate email. Thank you, PLANS Pick up latest marked drawings from Robert's otlice on Tuesday 15th, will make copy and send to Doug this week. DOCK See attached image. LIBRARY Status interior 1.interiors complete by construction Outstanding issues 1 meiling treatment Ion to visit week after next to start painting - work duration 2- 3 weeks - estimated completion date July 8th 2.cabinet finishes awaiting panel from Paris. delay now due in this week by the 19th 3.floor finishes Je to decide on next visit to Island. decision made by July 1st. Status exterior 1.courtyard paving underway complete by the July 31 2.irragation main ine underway complete by July 15 3. wall sconces to replace existing, will get info on them from Robert's office Outstanding issues 1.landscape plans a.plants 'gala to fill in area behind tiki hut with plants we chose awaiting new images from him b.irragatiion plans c.fighting will send sample lighting options via email this week EFTA_R1_01473856 EFTA02412285 2.Igala has trees tagged ready for delivery as soon as barge is ready MASTER SUITE Status interior 1.const under way ,subject to decisions being made should finish by Oct 31 Outstanding issues 1.steam bench 2.out side shower 3.lites over bed 4.lighting in bedroom 5.electrical in bath area 6.tub deck and surround 7.selection of wood floor 8.sourcing thassos slabs 9.powderroom vanity plan 10.shop drawings for stone I I . o r d e r rug for bathroom Status exterior 1.wall under way, complete by Aug 31 Outstanding issues 1.landscape plans..liting irr. KITCHEN Status 1.assume we get permit by July 1 should be complete by Nov.31 Outstanding issues 1.kitchen design 2.stair and wall design to master LAUNDRY 1.assume we get permit July 1 should complete by Oct 31 COTTAGES 1.const underway should complete by Sept 30 Outstanding issues 1.shower design Other guest cottage to be built in same complex: revisit idea on next visit EFTA_R1_01473857 EFTA02412286 MAIN HOUSE REMODEL Status no estimate to compleation tit program complete 1.courtyard side plan final,proceeding 2.roofing proceeding Outstanding issues 1.north side program MECHINICAL ELECTRICAL Status under way should complete by Sept 30 MECHANICAL DESAL Status under way should complete by Nov 30 POOUTHEATER 1.Gensler allow three months for plans 2.two months for permits Nov 30 3.pool by Mar 31 4. theater by Jun 30 EFTA_R1_01473858 EFTA02412287

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA02412285.pdf
File Size 139.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,770 characters
Indexed 2026-02-12T16:27:47.425552
Ask the Files