Back to Results

EFTA02421220.pdf

Source: DOJ_DS11  •  schedule  •  Size: 43.9 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

To: location@gmail.com[jeevacation@gmail.com] From: Sent: Mon 9/13/2010 7:08:11 AM Subject: GIIB maintenance Jeffrey. I used the toasted for several minuets no faults noticed, all was operating correctly. I have the Gulfstream being worked on at Meridian at Teterboro, the APU flamed out two times recently for no apparent reason. I heard a hissing sound from the exhaust before the APU flamed out, I suspect the fuel nozzle being plugged and not spraying a good pattern, which is necessary for jet fuel to bum under the high pressure. plus small interior cosmetic items and avionic items I would like repaired, Let me know if the schedule changes and when you think you will be ready to fly the Gulstream, I told them to have plane ready by Friday afternoon at the latest. I will keep you updated. thank you. Larry EFTA_R1_01487402 EFTA02421220

Document Preview

Extracted Information

Locations

Dates

Email Addresses

Document Details

Filename EFTA02421220.pdf
File Size 43.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 862 characters
Indexed 2026-02-12T16:36:51.758096

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files