EFTA02416793.pdf
Extracted Text (OCR)
To:
Jeffrey Epsteinueevacation©gmail.comj
From:
ion nicola
Sent
Wed 12/1/2010 1:54:45 AM
Subject: cabana no 3 and master bedroom
hi jeffrey,
..so cabana no 3 and the master bedroom are ready to go.
cabana no 3 still needed today a little work so in the meantime i did a little area with venetian
plasrter in master bedroom to see how it goes, because the walls are not that flat..but it looks
good after a few coats of venetian plaster. i started the samples for the master bedroom vestibule
too..thc background will be white venetian plaster too.
tomorrow i'll start cabana no 3 and i was thinking that we could start master bedroom too. i
think would be good if we have one or two more people because if i do by myself the entire area
with venetian plaster its going to take forever: usual), i put 3 or 4 coats of venetian plaster, but
here we have to put like 4 maybe 5 coats because the walls are not flat.. they are pretty bumpy,
then i have to put 2 more coats of wax and then burnishing everything with blade. and there are
two small rooms , the vestibule, and the master bedroom means kind of a lot to do. so maybe two
people would be even better..besides i might need an asistant for the cabana no I..it has big walls
anyway, this is just a thought for finishing faster the all bedrooms.
so, what do you think?
thank you,
ion
EFTA_R1_01481297
EFTA02416793
Document Preview
Document Details
| Filename | EFTA02416793.pdf |
| File Size | 77.3 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,389 characters |
| Indexed | 2026-02-12T16:37:37.910238 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.