To:
•
'
Cc:
From:
Emad Hanna
Sent:
Wed 12/1/2010 12:34:17 PM
Subject:
Nana
Jeffrey,
The replacement windows are being fabricated and will take 4 to 5 weeks. There are a couple of
things we need to be cleared up.
I) The old center front window had the ability to be opened the one that was fabricated did not.
Which way would you prefer the center window?
2) The vendor will send us pictures of several different handles for the sliding side windows.
Thank you
Emad Hanna
Project Controller
HBRK Associates
301 East 66th St
Suite 101
New York, NY 10065
Cell
LSJ Office
St. Thomas Office
NY Office
Fax (646) 350-0221
EFTA_R1_01482321
EFTA02417464
Document Preview
Document Details
| Filename | EFTA02417464.pdf |
| File Size | 44.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 673 characters |
| Indexed | 2026-02-12T16:37:46.525551 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.