Back to Results

EFTA02424060.pdf

Source: DOJ_DS11  •  Size: 384.2 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Warwick Wicksman jeevacation@gmail.conljeevacation gmai .com From: Gary Kemey Sent: Tue 8/17/2010 2:57:07 PM Subject: RE: LSJ living room and screening room Yes will you call me? From: Warwick Wicksman [mallto Sent: Tue 8/17/2010 10:44 AM To: 'jeevacation@gmail.com' Cc: Gary Kemey Subject: Re: LSJ living room and screening room Ok. Will call Gary to discuss details, and proposal for on-going concept design. Gary, can we have a call tomorrow at Sam PST? (I will be out of the office most of today.) Thanks, Warwick Wicksman Principal Sent from my BlackBerry Device. From: Jeffrey Epstein <jeevacation@gmail.com> To: Warwick Wicksman Cc: Gary Kemey aN > Sent: Mon Aug 16 18:53:34 2010 Subject: Re: LSJ living room and screening room please focus on scehmatic for new living room, the focus on the screening room can wait. 1 need a circulation plan that makes sense. thanks On Mon, Aug 16, 2010 at 6:49 PM, Warwick Wicksman wrote: Gary. just to close the loop on the options I wrote about last week, attached the two sets of sketches. SK-01 is a professional screening room in the existing living room. SK-02 is a slightly smaller screening room cast gay living room. II we pursue the existing living room scheme, what is the goal? Is a smaller room and screen ok? Or do deviate from the idea of a "professional-style" screening room - no booth or large projector - and study more of a high-end media residential-style media room? EFTA_R1_01491476 EFTA02424060 Thanks, Warwick Warwick Wicksman, AIA Princi al Gensler 2500 Broadway Suite 300 Santa Monica. California 90404 USA From: Warwick Wicksman Soot: Monday, August 16, 2010 7:44 AM To: 'Gary Kerney': Doug Schoettle Cc: Jeffrey Epstein Subject: RE: LSJ living room and screening room Ok. The attached "SK's" are very preliminary sketches of the existing living room, convened into a commercial- style screening room (double walls, separate booth, stadium steps. etc.). "Option B" is the alternate layout I proposed in my email last week. Thanks, Warwick Warwick Wicksman, AIA Principal Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA From: Gary Kerney Imailto EFTA_R1_01491477 EFTA02424061 Sent: Monday, August 16, 2010 6:36 AM To: Warwick Wicksman; Doug Schoettle Cc: Jeffrey Epstein Subject: RE: LSJ living room and scrccning room Warwick After spending the week on island Jeffrey believes his idea is sound.he will make the existing livingroom as good as a theater room it can be and go with new 30x50 living room to the east.please sketch out the concept for his review. Thanks Gary From: Warwick Wicksman [mailto Sent: Thu 8/12/2010 7:23 PM To• Cc jeevacation@gmail.com: Bryan Oakes Subsec : : wing room and screening room Hi Gary, I am following up on our conversation about convening the existing living room into the screening room, and adding a new living room towards the east. I some concerns about this that we need to review together: • The current layout of the main residence areas has the Living Room, the main "public space•", centrally located, on access with the main stairs, and adjacent the kitchen and guest cottages. I think this makes a lot of sense. It is the prime gathering space, and should be centrally located. • I understand the concerns about the Living Room being ••dark••. I think this could be resolved, by incorporating similar features that would be use in a new the living room. For example, adding some large windows, similar to the expanded Kitchen, could brighten up the room, and make it more usable. • The Living Room, re-worked upper terrace and pool area all flow together, making sense of this space. I do not think locating the Screening Room in that prime gathering space overlooking the pool makes as much sense. EFTA_R1_01491478 EFTA02424062 • The Screening Room itself functions separately from the rest of the residence areas. It will be probably be used less frequently, and could stand alone from the other spaces, without impacting the use of the other spaces. • The existing Living Room would require significant demolition to be converted into a professional screening room, and it would substantially smaller than what we previously discussed. o We would need to add acoustical walls within the building. I think this will reduce the overall usable space to about 21' wide x 32' long. o We need about 9' for the projection booth and 4' for the speaker chase. That would leave the screening room itself about 21' wide x 18' deep. o The screen would end up being about 18' wide x 10' tall. Within the current building height, it would be too close to the floor and ceiling. o We would need to raise the booth about 4'-5', to get the projector to the correct elevation, above the heads of the viewers. It looks like we do not have sufficient headroom for that. o We may be able to create one step on the floor, to create a stadium seating effect. but we do not have enough headroom to do more than that, o To keep within the existing building envelope, we would need to excavate down below grade to create sufficient headroom clearances. These concerns lead to the idea that we renovate the existing Living Room, adding windows to make it feel brighter and more pleasant, and we consider adding a smaller screening room, more similar in scale to the existing Living Room, east of the Living Room. We can make it smaller to fit more with the rest of the buildings scale, yet accommodate professional screening room features. Gary, we talked about the fact that we have now exhausted the current redesign allowance, and you requested a new Work Authorization to continue the conceptual design work. However, I propose we do the following first: 1. We arc preparing some diagrams that graphically show the concerns we have with the Living Room conversion to screening room. 2. We will prepare some diagrams that show this new layout, similar to the latest design, but with a smaller, more in-scale but still professional Screening Room. 3. Once that we review this together, we can either: a. Move forward with a new design proposal for the overall project, or b. Split the pool area and screening room apart contractually, allowing us to proceed with pool area development towards a permit, and pursue the alternate screening room concepts separately. (This would speed up your main construction schedule.) EFTA_R1_01491479 EFTA02424063 As to a meeting on the Island on 8/30, I do not think that leaves us enough time to develop this new concept, and prepare the 3D images for review. Once we discuss this more, and figure out the right path, we can establish a schedule for deliverable and meetings. I think it would be closer to 9/15/10. I look forward to your comments! Doug, please weigh in on your thoughts! Thanks! Warwick Warwick Wicksman, AIA Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA Original Message From: Gary Kerney [mailt Sent: Wednesday, August 11, 2010 8:43 AM To: Warwick Wicksman Subject: If possible the 30 and 31 of aug at island. Gary Sent from my iPhone The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of EFTA_R1_01491480 EFTA02424064 Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any pan thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to ieevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. EFTA_R1_01491481 EFTA02424065

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02424060.pdf
File Size 384.2 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 7,830 characters
Indexed 2026-02-12T16:46:42.924438
Ask the Files