Back to Results

EFTA02425591.pdf

Source: DOJ_DS11  •  Size: 161.9 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Jeevacation E stein 'eevacation mail.com] Cc: ; Gary Kerney From: Shelley Sent: Sat 5/8/2010 1:24:06 PM Subject: Fwd: minutes of 5/6'10 with decision on time frames for next round of drawings, plus.. Begin forwarded message: From: "Gary Kerney" Date: May 7, 2010 3:17:27 PM EDT To: "Jeffrey Epstein" <leevacation(Thclmail.com> Cc: Subject: minutes o Agenda visit 5/6/10 WITH MINUTES 5/7/10 Master suite 1. Shower/steam design put chair in tiki hut from master bed into the bathroom RECIEVED FINAL PLANS 2. white tassos in steam/shower a.white glass in dressing room cost $ 55,000 5 months lead time plus install and shop drawing time b.Tassos in dressing room cost $ 30,000 2 months delivered and installed SEE 1 3.tub and room design DESIGN PENDING 4.arch openings between bed and bath KEEP 5.wood flooring design, coral gone on dressing room floor SEE 1 6.treatment of bedroom walls PLASTER THEN ROBERT WILL DECIDE ON FINAL 7.door review? ROBERT TO FORWARD PLAN MAY CLOSE OFF DOORS ON WEST EFTA_R1_01493978 EFTA02425591 8.tv location decision made to not put desk in tiki hut back into bedroom SEE 8 Library courtyard design GAVE ROBERT AS BUILTS AND REVIEWED ALTERNATIVE MATERIALS TO MAKE DESIGNS Ready by May 11- 12th Kitchen 1.interior design SENT CAD DRAWINGS TO ABRAM,AND WENT OVER FUNCTION WITH BRICE, ROBERT TO PRODUCE DESIGN DRAWINGS Ready by May 17 - 18th for view, review in NY if possible 2.COLUMN DECISION Ready by May 11-12th ROBERT TO DO TWO OR THREE ALTERNATIVES IN PHOTO SHOP GARY TO PRICE 1 KEEP ARCHES WITH PLASTER COLUMNS 2 KEEP ARCHES WITH PLASTER COLUMNS AND STONE BASE 3 REMOVE ARCHES AND NEW STONE COLUMNS -Cottages 1. Door approval DONE 2. Shower decision a.fully enclosed stone and tiled, seems to tight to me b.collum plus roof and screen seems right ROBERT TO SKETCH UP PLAN .GARY TO PRICE 3.Abram gave us direction on elect. how about TV?data ect. 4.design for vanities to replace pedestal sinks and any change to bath rooms(currently none in budget) ROBERT TO FORWARD PLAN/SPEC Site 1.review wall progress 2.Get everyone thinking about walk from kitchen to master to library EFTA_R1_01493979 EFTA02425592 WE REVIEWED THE SKETCHES AND ROBERT TO REFINE PLAN Gensler WE REVIEWED ROBERTS PLAN FOR THE THEATER /POOL AND HE WILL REVISE AND FORWARD TO ME TO STAKE OUT To be viewed on May 14th CZM Deionoh Jeffrey last time we didn't get to tiki, pool pavilion, kite house, entry, plaza, theater and indoor pool with Robert and you together Publisher and Editor-in-Chief Chocolate Sauce. "Nourishing the Inner Worlds of Children" EFTA_R1_0 1493980 EFTA02425593

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02425591.pdf
File Size 161.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,669 characters
Indexed 2026-02-12T16:47:56.577330
Ask the Files