Back to Results

EFTA02427106.pdf

Source: DOJ_DS11  •  Size: 58.2 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Jeffrey Epsteinueevacation@gmaitcom] Cc: Brice Gordonfli: William Rowles From: Gary Kerney Sent: Tue 3/23/2010 7:35:26 PM Subject: JP My thoughts as to scheduling 1.we are looking at ordereing a dehumidifier for the system that will bring the humidity down to 45% for about $3,000,expressed in from Fla. and be operational in a week.The room should dry in 30 days in my opinion.4/2/10 to5/2/10 2.Fancelli wood workers should be done by Fri. and go home with everything done except the blackboard.3/26/10 3.The fancelli painters are going home and will retum when the wood is climatized3/24/10 4.We could put the scaffolding up next week and by Thurs.3/28/10 have it ready for lon.he could do his work while the dehumidifier is working 3weeks?4/1/10 to 4/22/10 5.The scaffolding and plywood could be removed for Fancelli4/28/10 6.Fancelli painters show up to finish cabinetry5/2/10 to 6/2/10 7.Stain?and or clear coat floor6/7/10 to 6/11/10 &Install fumiture6/14/10 JP asked to be notified with as much advance notice as to when the room is ready to schedule the painters EFTA_R1_01496178 EFTA02427106

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02427106.pdf
File Size 58.2 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,130 characters
Indexed 2026-02-12T16:48:27.921769
Ask the Files