EFTA02427106.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
Jeffrey Epsteinueevacation@gmaitcom]
Cc:
Brice Gordonfli:
William Rowles
From:
Gary Kerney
Sent:
Tue 3/23/2010 7:35:26 PM
Subject:
JP
My thoughts as to scheduling
1.we are looking at ordereing a dehumidifier for the system that will bring the humidity down to 45% for about
$3,000,expressed in from Fla. and be operational in a week.The room should dry in 30 days in my
opinion.4/2/10 to5/2/10
2.Fancelli wood workers should be done by Fri. and go home with everything done except the
blackboard.3/26/10
3.The fancelli painters are going home and will retum when the wood is climatized3/24/10
4.We could put the scaffolding up next week and by Thurs.3/28/10 have it ready for lon.he could do his work
while the dehumidifier is working 3weeks?4/1/10 to 4/22/10
5.The scaffolding and plywood could be removed for Fancelli4/28/10
6.Fancelli painters show up to finish cabinetry5/2/10 to 6/2/10
7.Stain?and or clear coat floor6/7/10 to 6/11/10
&Install fumiture6/14/10
JP asked to be notified with as much advance notice as to when the room is ready to schedule the painters
EFTA_R1_01496178
EFTA02427106
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA02427106.pdf |
| File Size | 58.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,130 characters |
| Indexed | 2026-02-12T16:48:27.921769 |