To:
Jeffre E teflevacation©gmail.com]
From:
Sent:
Wed 11/18/2009 8:50:28 PM
Subject:
LSJ
This project iS a combination of owners design team and project design
management.
PROJECT SCOPE
- The development of a total design program
- Analysis of all project building phases with anticipated client on island
expectations.
- Acting as an information conduit between client and on site construction
management - Develop and clean up existing plans,create detailed int des
documents,perform decorating services that are coordinated with design documents.
PROJECTS
PROJECT A
Laundry,Master Suite and Library
Review all drawings and develop a finish schedule
Create specs for all areas: we use a software called Spexx which will be a
complete record for every item be it a arch finish or FFE item.(An example of
this deliverable will be sent to you)
This is used on the site as well as for purchasing.
Decor will be presented (if you have this done then it can be reviewed and
manage)
PROJECT B
Main Pool and Great room compound to include porches,added bungalows and walk
ways
Review existing plans and design program and set out to reevaluate these plans
and make changes where needed
Develop a DD set that includes these new ideas
Interior finishes and fixture program will be defined
CD set started so as to define a budget.
Manufacturing will be vetted and sample phase will begin
Decor will be presented and a budget developed
SATELLITE PROJECT
Other structures on island will be redesigned
Canter levered pavilion will be designed.
The kite pavilion will redesigned
Tennis court and pavilion redesigned
Plus others
Power requirements need to be thought through and incorporated into new power
grid. Solar and or Wind powered generators is an option
(There needs to be an overall design language developed so all details become
EFTA_R1_01508425
EFTA02436090
unified and systemized so as to streamline construction means and methods which
in turn will drive budgets down)
PLATAUGH PROJECT
Develop location and axis
A Vision needs to be developed
Power requirements need to be thought through and incorporated into power overall
power program
-Is this a potential place for invited people to come too for isolated thinking
-is this a place to have an international forum
-is this a simple place for the client
-is this an art installation (mash Kampour (spelling?)...on and on
PHASING
This is a collaborative endevour and is directly liked to the difficult Island
of St Thomas dept of Buildings and it's bureaucracy.
We will develop this with the Construction team
Once this is in place we will plug in the design phases
Because of this all projects mentioned above will be done parallel to each other
Project A is immediate and needs to be ready for June 2010
Project B needs to start construction with full budgets in place by May 2010
(Contractor will file existing plans so as to obtain approval to be amended
later}
PROJECT TEAM
THIS IS A PROMISE:
I will dedicate myself to this project and oversee all design aspects: help
client through existing issues on Project A and then oversee design on the other
projects.
Selection of all finishes,equipment,lighting and furnishings will be my
responsibility .
Architectural
TEAM I
Jorge Porta: project leader for zeffdesign on Hard Rock ..coordinated all aspects
including construction management and coordination of all parties ...been with me
for 10 years...a detail giant (sending his drawings with package)
Corey Chapman: assistant draftsman.Has been Jorge s assistant for two years
Team II
Javier Rodriguez or Sarah Lutalah
Team leaders on big residential and hotel projects
DECOR and FFE TEAM (let's get
Stacy Meador and Donna Lee:
These two did the FFE for new
new build in 18 months...they
wanted them full time
a fresh team for you)
tower at Hard Rock which was over 1 mm squ ft of
are so proficient that the development team at HRH
I can provide references on all these people.
DEDICATED TIME
EFTA_R1_01508426
EFTA02436091
The arch TEAM I and the DECOR TEAM I
We can start with these two teams and when needed bring on the 2nd team for Arch
once Satellite and Plateau projects start.
As I said I will be doing this project full time...4 hours per day minimum plus
on site.
the design team will be dedicated resources full time ...Jorge will partner with
Sarah or Javier as we get into more Projects.
Each project will have a leader once they get into the DD and CD phases.
ON SITE
Once Garry and I figure out the project phasing and critical path timetable the
on site presence will be a weekly or even full time program based on project
needs....Dedicated.
I will be on site as often as is required...every 10 days,whatever it takes.
On site is a bell curve that we know how to manage well.
EFTA_R1_01508427
EFTA02436092
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA02436090.pdf |
| File Size | 221.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 4,888 characters |
| Indexed | 2026-02-12T16:58:29.107422 |