Back to Results

EFTA02434592.pdf

Source: DOJ_DS11  •  email/external  •  Size: 44.3 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

To: Cc: jeevacation©gmaitcompeevacation@gmailcom] From: Doug Schoettle Sent Fri 11/6/2009 3:30:40 PM Subject: Faux Painters for office ceiling at LSJ Dear I understand from JEE that painters arc to go to to paint the ceiling and sliding panels. Lets coordinate the travel dates and, especially, what the painters will require in the way of scaffolding and other requirements they will need to perform the work. Also, a time frame the painters will need to complete the work. The flooring will be installed early December, Fanelli woodworking owes us some work to complete the paneling but has not given a schedule, so the timing of this all knits together. Thank you. Doug EFTA_R1_01506298 EFTA02434592

Document Preview

Extracted Information

Dates

Document Details

Filename EFTA02434592.pdf
File Size 44.3 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 720 characters
Indexed 2026-02-12T16:59:12.081269

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files