To:
J Epstein[jeevacation©gmail.com]
From:
Brice Gordon
Sent:
Sat 5/16/2009 9:30:46 AM
Subject: Re: Mechanical & Engineering Plan.
Title: Re: Mechanical & Engineering Plan. Curtis is working on budget draft, will confirm with him
when you should expect to receive it.
I will forward photo's today. Please note Trackhoe had blown head, Rock Crusher should be up and
running next week.
In regard to Scott Graff, needed to find replacement before releasing as there is no body on staff able
to perform this task. I discussed this with you in December. As I mentioned yesterday, Adam Cook
might be able to provide this service and we will be able to get rid of Graff.
Brice
On 5/16/09 10:05 AM, "Jeffrey Epstein" <jeevacation@gmail.com> wrote:
i would like to know,when I will receive my genslre very rought draft of budget and
timetable.. , why when in my nov notes. it says we agreed to rid of scott graff. that
this has not happened.. I would like to see photos of the gravel that we are making
and the hydroseeding please.. thanks as always
On Sat, May 16, 2009 at 4:52 AM, Brice Gordon
wrote:
To: JEE
Attached is a basic plan for the build out of the existing Mechanical and
Engineering. Some of these ideas have been suggested separately, but this
plan ties everything together, for a total overview.
1. Fit out New Mechanical Building with the following:
2 x generators & switch gear, fire suppression equipment
2 x Fuel Tanks
1 x new RO system, poly tanks below for water storage
TI & Data/fiber Distribution Room.
2. Replace existing Metal Structure at engineering with a larger enclosed
shelter to accommodate the servicing of heavy machinery, basic
refurbishment of existing tool storage areas.
3. Lay a concrete pad and retaining wall between Mechanical and Engineering
buildings for fuel truck storage and oil containment. This would satisfy
DPNR requirements for such storage.
4. Erect a new enclosed Metal structure to house 3 ax 40' containers for
hurricane storage, landscape material and a parking area for atv's,
polaris's etc. This location would be above flood Plain.
5. Terrace area as you suggest, below proposed Heli Pad parking area and
metal structure below
EFTA_R1_01517539
EFTA02442514
Should we proceed with estimating expenditure for each phase of this plan?
For your consideration.
Regards Brice
End of Forwarded Message
EFTA_R1_01517540
EFTA02442515
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA02442514.pdf |
| File Size | 121.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,426 characters |
| Indexed | 2026-02-12T17:07:45.423937 |