Back to Results

EFTA02442967.pdf

Source: DOJ_DS11  •  Size: 59.8 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: J Epsteinueey " Cc: Darren Indyke From: Brice Gordon Sent: Thur 5/28/2009 9:45:41 AM Subject: Mechanical Building, retaining walls To: JEE Contacted Tom Melnick in regard to the retaining walls for the Mechanical Building. His recommendation is to do the Following. 1. form pad and retaining walls between existing engineering and new mechanical building, this area would be use for fuel truck storage etc. Please note original plans had an access road, and existing engineering removed. The above would give you the option to refurbish engineering structure later. 2. If you do not intend to extend Mechanical building for new RO and cistern, then another retaining wall will need to constructed to retain fill and also to give access to roof area for boat trailer storage etc. Your last indication to extending the building was , "probably" Notes: Tom needs a decision by Friday, as to which direction you wish to proceed and to keep on schedule. Newman and Moll will demobilize by the end of next week, i.e. all forms, containers of equipment will be removed from the Island Would recommend that Tom views budget on this, once direction is given. Please advise Brice EFTA_R1_01518180 EFTA02442967

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA02442967.pdf
File Size 59.8 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,234 characters
Indexed 2026-02-12T17:08:08.193171
Ask the Files