Back to Results

EFTA02442238.pdf

Source: DOJ_DS11  •  email/external  •  Size: 53.4 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

To: JEE[jeevacation@gmail.com] From: curtis Sent: Fri 5/1/2009 1:43:13 PM Subject: Job description Title: Job description Doug: Answering questions from Silvina , if needed.when referring to original design intent - example — Archive lighting. He was cc'd on all billing inquiry / issues with Maguire He is cc'd on Dejong issues . Not all He has no contact with regard to Gensler No contact with regard to Hasan. Charles: No contact since I sent him your directive to put the Wind Turbine on hold. Bill: Estimating —first draft and reprising as needed Getting actual pricing from subs. Pricing materials Ordering materials Negotiating final price (buyout) and and drafting contracts with subs. Processing invoices. Procuring Subcontractors On 4/30/09 8:08 AM, "JEE" <jeevacation@gmail.com> wrote: Please detail for me what doug Charles and bill roeles are doing -in addition please make sure that sylvina Is talking to hadab Kahn Sent from my iPhone EFTA_R1_01517108 EFTA02442238

Document Preview

Document Details

Filename EFTA02442238.pdf
File Size 53.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,009 characters
Indexed 2026-02-12T17:08:44.234517

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files