EFTA02440399.pdf
Extracted Text (OCR)
To:
Jeffrey Epstein[jeevacation©gmail.com]
From:
Doug Schoettle
Sent
Fri 7/24/2009 8:15:59 PM
Subject: Re:
Jeffrey, Ouch, I thought that the hand held shower and valve in the steam room was to be
installed this last Monday. I will follow up with Foster plumbing.
Regarding Landscape Lighting, I talked with Luis Castro who is the president and lead designer
at Vernan Danials Lighting and asked that he schedule a visit with you at the property after dark
as soon as possible. Luis said that he specified and installed 100 wt. lightbulbs and ballasts in the
south palm grove garden, but the Palm Beach code inspectors said that 50 wt. was the largest
allowable and the bulbs and ballasts were changed to comply. The bulbs should be changed to
what was originally specified. Additional lighting circuits are positioned around the garden to
allow additional landscape lighting to be added without trenching the garden. This includes the
south arden, sculpture at end of pool, front entry courtyard. Luis Castro,
cell ;
office.
--- On Fri, 7/24/09, Jeffrey Epstein leevacation(i4maiLcom> wrote:
From: Jeffrey Epstein <jeevacation®gmail.com>
Subject:
To: "Doug Schoettle"
Cc: "Emad Hanna"
Date: Friday, July 24, 2009, 1:41 PM
what happened to the hand hedl shower install„ and edid you talk to the lighting
person')
emad stopek says he is to come back next week to re plant ficus spray, clean
up garbage behind shed. etc.. please follow up
EFTA_R1_01514357
EFTA02440399
Document Preview
Extracted Information
People Mentioned
Locations
Document Details
| Filename | EFTA02440399.pdf |
| File Size | 87.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,496 characters |
| Indexed | 2026-02-12T17:09:22.891956 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.