EFTA02443511.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
Schoettle[
JEE 'eevacation
mail.com]; Brice Gordon
; Emad Hann
From:
curtis
Sent:
Tue 6/9/2009 1:22:32 PM
Subject: Master Bath & Bed
Title: Mastcr Bath & Bed
Doug
• April 4th - CZM permit start up was required— exterior demolition and plant clearing, silt
fencing.
• April 27th — 28th Master Bathroom taken apart — during inventory of Bedroom/Bathroom
• Sinks outside for no good reason — but they are undamaged and will be properly stored.
• We can begin - Master bath foundation, walls, electrical and plumbing roughing when you
give us the go ahead, Building Permit received last week.
• Exterior column design unclear.
• Details & specifications based on exactly what you had before — we can complete most issues
with this information — No Designer on Board.
• We can reused — Vanities which are in fine shape — shower doors to speed schedule forward
• Need budget approval to allocate funds — order long lead
On 6/9/09 8:05 AM, "JEE" <jeevacation@Rmail.com> wrote:
when was my master bathrroom taken apart„ why are the sinks outside for weeks on
end ? when was the cabana taken down„ when is the master bath project actually going
to begin„
EFTA_R1_01518905
EFTA02443511
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA02443511.pdf |
| File Size | 63.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,207 characters |
| Indexed | 2026-02-12T17:09:22.917605 |